Similar Projects
Parking Lot Sweeping and Pressure Washing and or Steam Cleaning Services at the Salina DMV Field Office
Term Contract, Infrastructure
Bidding
Salinas, CA 93906

Monte Bella Subdivision Street Sweeping
Infrastructure
Bidding
Salinas, CA

VAGLA Healthcare Server Room And Site Communication Infrastructure
Infrastructure, Alteration
Post-Bid
Los Angeles, CA 90073

CHP Mt Pass Parking Lot Steam Cleaning
Infrastructure
Post-Bid
Sacramento, CA

Encampment Clean-Up Contractor
Alteration
Results
Santa Clarita, CA

Install Dpp Infiltration and Construct Maintenance Vehicle Pullout
Infrastructure
Results
$4,280,000 est. value
CA

Pavement Maintenance and Repairs
Alteration
Bidding
$700,000 to $800,000 est. value
Solana Beach, CA

One Time Clean Up And Landscape Maintenance
Term Contract, Alteration
Post-Bid
$53,464 est. value
Los Angeles, CA 90066

Parking Lot Sweeping and Pressure Washing and or Steam Cleaning Services
Term Contract, Infrastructure
Bidding
$38,969 est. value
Carmichael, CA 95608

CHP-Gilroy Commercial Vehicle Enforcement Facility (CVEF) Southbound (SB) – Parking Lot Steam Cleaning Services
Term Contract
Post-Bid
Gilroy, CA

CHP - Gilroy Commercial Vehicle Enforcement Facility (CVEF) Northbound (NB) - Parking Lot Steam Cleaning Services
Infrastructure
Post-Bid
San Martin, CA 95046

Steam Cleaning Services
Alteration
Post-Bid
Thousand Oaks, CA 91320

Hollywood DMV Parking Lot Sweeping
Term Contract
Post-Bid
$75,272 est. value
Los Angeles, CA 90038

CHP Chowchilla River Commercial Vehicle Enforcement Facility (CVEF) - Bi-Weekly Parking Lot Sweeping Services
Term Contract
Post-Bid
Le Grand, CA 95333

Parking Lot Sweeping And Pressure Washing And/Or Steam Cleaning Services
Alteration
Post-Bid
$140,724 est. value
Pomona, CA 91766

Last Updated 02/04/2022 01:44 AM
Project Title

Install Dpp Infiltration and Construct Maintenance Vehicle Pullout

Physical Address View project details and contacts
City, State (County) CA   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 070030 Lead Compliance Plan Ls Lump Sum 2 080050 Progress Schedule (Critical Path Method) Ls Lump Sum 3 090100 Time-Related Overhead (Wday) Wday 380 4 090200 Dispute Resolution Advisor On-Site Meeting Ea 1 5 090207 Hourly Off-Site Dispute-Resolutionadvisor- Related Tasks Hr 24 6 120090 Construction Area Signs Ls Lump Sum 7 120100 Traffic Control System Ls Lump Sum 8 120165 Channelizer (Surface Mounted) Ea 120 9 129000 Temporary Railing (Type k) Lf 11,800 10 129100 Temporary Crash Cushion Module Ea 140 11 130100 Job Site Management Ls Lump Sum 12 130300 Prepare Storm Water Pollution Prevention Plan Ls Lump Sum 13 130310 Rain Event Action Plan Ea 38 14 130320 Storm Water Sampling And Analysis Day Ea 12 15 130330 Storm Water Annual Report Ea 1 16 130530 Temporary Hydraulic Mulch (Bonded Fiber Matrix) Sqyd 69,000 17 130610 Temporary Check Dam Lf 1,660 18 130620 Temporary Drainage Inlet Protection Ea 10 19 130640 Temporary Fiber Roll Lf 17,200 20 130680 Temporary Silt Fence Lf 16,400 21 130710 Temporary Construction Entrance Ea 23 22 130730 Street Sweeping Ls Lump Sum 23 146007 Invasive Species Control Ls Lump Sum 24 153248 Remove Concrete (Miscellaneous) (Sqft) Sqft 5,320 25 160110 Temporary High-Visibility Fence Lf 1,070 26 170105 Clearing And Grubbing (Acre) Acre 8 27 190101 Roadway Excavation Cy 6,900 28 012902 Roadway Excavation (Type c-1) Cy 56 29 190105 Roadway Excavation (Type z-2) (Aerially Deposited Lead) Cy 10,100 30 194001 Ditch Excavation Cy 480 31 200002 Roadside Clearing Ls Lump Sum 32 200052 Prune Existing Plants Ls Lump Sum 33 202039 Slow-Release Fertilizer Lb 410 34 012903 Remove Tree Ea 20 35 012904 Tree Protection Ea 6 36 204008 Plant (Group h) Ea 10,400 37 204035 Plant (Group a) Ea 55 38 204036 Plant (Group b) Ea 330 39 204038 Plant (Group u) Ea 20 40 204097 Plant Establishment Work (Minimum Bid) Ls Lump Sum 41 205035 Wood Mulch Cy 110 42 206400 Check And Test Existing Irrigation Facilities Ls Lump Sum 43 206405 Remove Irrigation Facility Ls Lump Sum 44 206560 Control And Neutral Conductors Ls Lump Sum 45 206562 1" Remote Control Valve Ea 11 46 206564 1 1/2" Remote Control Valve Ea 9 47 208445 Tree Well Sprinkler Assembly Ea 430 48 208446 Riser Sprinkler Assembly (Gear Driven) Ea 80 49 208575 2" Gate Valve Ea 2 50 208595 (f) - 1" Plastic Pipe (Schedule 40) (Supply Line) Lf 6,678 51 208596 (f) - 1 1/4" Plastic Pipe (Schedule 40) (Supply Line)Lf 2,099 52 208597 (f) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line)Lf 205 53 208598 (f) - 2" Plastic Pipe (Schedule 40) (Supply Line)Lf 530 54 208605 (f) - 2" Plastic Pipe (Class 315) (Supply Line) Lf 1,126 55 208683 Ball Valve Ea 5 56 208690 (f) - Pvc Pipe Conduit (Sleeve) Lf 102 57 210280 Rolled Erosion Control Product (Blanket) Sqft 4,430 58 210350 Fiber Rolls Lf 2,630 59 211111 Permanent Erosion Control Establishment Work Ls Lump Sum 60 260303 Class 3 Aggregate Base (Cy) Cy 26 61 280000 Lean Concrete Base Cy 110 62 390132 Hot Mix Asphalt (Type a) Ton 120 63 390136 Minor Hot Mix Asphalt Ton 48 64 390137 Rubberized Hot Mix Asphalt (Gap Graded) Ton 110 65 394077 Place Hot Mix Asphalt Dike (Type f) Lf 210 66 398100 Remove Asphalt Concrete Dike Lf 3,100 67 401050 Jointed Plain Concrete Pavement Cy 33 68 510060 (f) - Structural Concrete, Retaining Wall Cy 238.9 69 510092 (f) - Structural Concrete, Headwall Cy 29 70 510094 (f) - Structural Concrete, Drainage Inlet Cy 2.5 71 510501 (f) - Minor Concrete Cy 63.4 72 012905 Dpp Infiltration Area (Gravel) Cy 7,670 73 012906 Dpp Infiltration Area (Aggregate Topsoil) Cy 500 74 012907 Dpp Infiltration Area (Compost) Cy 380 75 665012 12" Corrugated Steel Pipe (.079" Thick) Lf 80 76 665017 18" Corrugated Steel Pipe (.079" Thick) Lf 110 77 691902 10" Flume Downdrain Lf 50 78 692364 10" Flume Anchor Assembly Ea 3 79 705011 18" Steel Flared End Section Ea 3 80 710132 Remove Culvert (Lf) Lf 55 81 710166 Remove Asphalt Concrete Overside Drain Ea 1 82 710167 Remove Flared End Section (Ea) Ea 1 83 710240 Modify Inlet Ea 1 84 723080 Rock Slope Protection (60 Lb, Class Ii, Method b) (Cy) Cy 660 85 723095 Rock Slope Protection (20 Lb, Class i, Method b) (Cy) Cy 25 86 729011 Rock Slope Protection Fabric (Class 8) Sqyd 1,840 87 731519 Minor Concrete (Stamped Concrete) Sqft 150 88 731840 Remove Concrete (Curb And Gutter) Lf 260 89 802180 12' Chain Link Gate (Type Cl-4) Ea 1 90 803050 Remove Chain Link Fence Lf 27 91 820113 Treatment Best Management Practice Marker Ea 44 92 820151 Object Marker (Type l-1) Ea 22 93 820840 Roadside Sign - One Post Ea 22 94 999990 Mobilization Ls Lump Sum

Details

Division 01 - General Requirements, Cleaning and Waste Management.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents