Similar Projects
Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - General Bid
Renovation
Bidding
$5,000,000 est. value
Acton, MA

Catch Basin Cleaning
Infrastructure
Bidding
$45,000 est. value
Sudbury, MA

Renovations and Equipment Upgrades to the Main Street Pump Station - SUB Bid
Renovation
Sub-Bidding
$116,000 est. value
Hudson, MA

2021 Sewer Pump Station On-Call Repair, Maintenance and Wet-Well Cleaning
Post-Bid
$131,595 est. value
Burlington, MA

Rehabilitate Existing Sewer Collection System
Post-Bid
$500,000 est. value
Tyngsborough, MA

Main Street, Bow Street, Albion Street Sewer Repairs
Results
Less than $425,000 est. value
Medford, MA

Catch Basin Cleaning
Results
Lexington, MA 02420

Catch Basin Adjustments
Infrastructure
Bidding
$25,000 est. value
Sudbury, MA

Town Hall - Sewer Lateral Line Replacement
Post-Bid
$40,000 est. value
Pepperell, MA

Fox Hill Drive Water and Sewer Project
Results
$1,600,000 est. value
Natick, MA 01760

Guardrail, Pavement Markings, Roadway Management, Bituminous Products, Crack Sealing, Tree Planting, Stormwater Pond Maintenance and Catch Basin Cleaning
Infrastructure
Bidding
Wilmington, MA

Removal of Infiltration and Inflow from Sewer
Post-Bid
Everett, MA

Kenmore Terrace Sewer Main Replacement Project
Results
Waltham, MA 02453

Catch Basin Cleaning and Material Disposal
Infrastructure
Bidding
Hopkinton, MA

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Post-Bid
Belmont, MA

Last Updated 04/21/2022 08:08 AM
Project Title

Francis Wyman Pump Station Rehabilitation and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Burlington, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Francis Wyman Pump Station Rehabilitation and Force Main Replacement. The scope of work includes rehabilitation of an existing sewer pump station, installation of approximately 4,100 linear feet of 12-inch ductile iron force main, 800 linear feet of 15-inch PVC gravity sewer, and other related tasks in the Town of Burlington, Massachusetts.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents