Similar Projects
Z2DZ--Replace HVAC B404 (C) 676-16-102
Design
$2,000,000 to $5,000,000 est. value
Tomah, WI 54660

Beyer Home Chimney Replacement
Bidding
Oconto, WI

UW Platteville HVAC System Renovation And Skylight Replacement
Renovation
Bidding
Platteville, WI 53818

Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

HVAC Replacement
Bidding
WI

Ionization System Installation
Post-Bid
Lancaster, WI 53813

Heating and Cooling Units Replacement
Results
Less than $210,000 est. value
Janesville, WI 53546

Wi Resource Center Building `B` Air Tempering
Renovation
Bidding
Oshkosh, WI

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

Replacement of Furnaces
Results
$25,000 to $100,000 est. value
Fountain City, WI 54629

Air Handling Unit Replacement
Bidding
Less than $65,000 est. value
Kenosha, WI 53144

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Last Updated 03/25/2021 06:05 AM
Project Title

Building B Air Tempering - Phase 1 - MEP

Physical Address View project details and contacts
City, State (County) Oshkosh, WI   (Winnebago County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of demolition of existing heating and ventilation equipment serving wings B5 and B6; installation of a new packaged penthouse air handling units on the roof of wings B5 and B6; and installation of new supply air, return air and exhaust air distribution systems for wings B5 and B6. Supply air distribution includes new VAV reheat boxes. The existing hot water system will be extended to serve the existing VAV reheat coils and AHU preheat coils. The existing chilled water system will be extended to serve the AHU chilled water coils. Work includes new DDC control systems to support the new mechanical systems and system upgrades. New ceilings and LED lighting are being provided in Wings B5 and B6. General trades, electrical, plumbing and fire protection work will support the upgrades.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents