Similar Projects
SH-20 - Bridge and Approaches
Infrastructure, Renovation
Conception
$2,751,704 CJ est. value
Hominy, OK 74035

Bridge and Approaches - SH 48
Infrastructure
Conception
$1,509,650 CJ est. value
Tupelo, OK 74572

Demolition of Old Police Station
Demolition, Infrastructure
Design
$12,000 CJ est. value
Lawton, OK 73501

Resurface - US 62
Infrastructure
Design
$6,700,000 CJ est. value
Cache, OK 73527

Eufaula Lake Stilling Basin Repairs
Infrastructure
Bidding
$5,000,000 CJ est. value
Stigler, OK 74462

Perimeter Road Rehabilitation - Phase 1
Infrastructure
Bidding
$6,000,000 CJ est. value
Tulsa, OK 74115

University of Oklahoma Softball Stadium
Demolition, New Construction, Infrastructure
Sub-Bidding
$42,000,000 CJ est. value
Norman, OK 73069

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Wyandotte Nation - Turtle Hill Estates Phase I
Infrastructure, Alteration
Results
Wyandotte, OK

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

Crest Fresh Market - Covell and Sooner / Edmond
New Construction, Infrastructure - 101,422 SF
Construction
$27,000,000 CJ est. value
Edmond, OK 73034

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

Last Updated 10/31/2022 01:36 AM
Project Title

Utilities - US 64

Physical Address View project details and contacts
City, State (County) Cherokee, OK 73728   (Alfalfa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-64: Begin Approx 7.4 Mi East of the Jct Sh-8, Extend East Approx 6.4 Mi to the Grant C/l (Ut for 34269(04)) As of October 31, 2022, the project is in Design status. Anticipated letting month/year is March, 2023. Length : 6.400 Mi. OKDOT - Utilities - US 64 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents