Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Child Day Care Center - Playground
Renovation, Build-Out - 2,400 SF
Post-Bid
South Holland, IL 60473

Grove Elementary School Campus
Renovation, Addition
Post-Bid
Barrington, IL 60010

2021 School Renovations and Additions
Renovation, Addition
Results
Mount Prospect, IL 60056

Roof Replacement Work 2021
Renovation
Results
Less than $400,000 est. value
Chicago, IL 60638

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

2021 Pietrini, North & Passow ES Library
Renovation
Post-Bid
Franklin Park, IL 60131

NCP Hibbard Elementary School
Results
Chicago, IL 60625

Waste Processing Equipment System
Term Contract
Post-Bid
$25,000 est. value
Maywood, IL 60153

MEP Disney Magnet School
Renovation
Results
$10,000,000 est. value
Chicago, IL 60613

Surface Grinders
Post-Bid
Elgin, IL

2021-25681-SIT Volta ES
Renovation
Results
Chicago, IL 60625

STEAM Lab at Karel Havlicek ES
Renovation
Post-Bid
Berwyn, IL 60402

ROF James Wadsworth ES
Renovation
Results
Chicago, IL 60637

Last Updated 07/27/2022 04:03 AM
Project Title

RFQ Contractor - Intercom System Replacement for Ortiz De Dominguez 2022 - Only Pre-Qualified Various Trades

Physical Address View project details and contacts
City, State (County) Chicago, IL 60623   (Cook County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Equipment
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Each Bidder must include in their Bid the premium cost for the performance and payment Bond in the full amount of their contract, when the project is over $50,000. If the Bidder fails to furnish the performance bond within seven (7) days after acceptance of the Bidder's Bid, by the Board, the Bid acceptance maybe rescinded, and the Bidder maybe precluded from further Bidding with the Board. The performance Bond must be issued by a surety acceptable to the Board and Licensed by the State of Illinois. Questions Due Date Online Portal The Q and A Period for this Opportunity is Ongoing Never

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents