Similar Projects
Synthetic Natural Gas (SNG) Back-Up System
Infrastructure
Bidding
$2,000,000 est. value
Vacaville, CA 95687

Contract for Fuel Site and UST Maintenance, Repair, and Testing
Term Contract, Infrastructure
Bidding
Fresno, CA

Above Ground Fuel Storage Tank
Infrastructure
Post-Bid
San Jose, CA

J045--Fuel Filtering/Underground Tanks / Generators
Term Contract
Post-Bid
Loma Linda, CA 92357

Propane Repairs at Death Valley National Park
Term Contract
Results
Death Valley, CA

Above Ground Fuel Storage Tank and Dispensing Systems
Alteration
Results
Auburn, CA

Arrow Maintenance Facility (AMF) Hydrogen Fuel Upgrade Project: Hydrogen Fuel System (HFS)
Infrastructure
Bidding
$4,000,000 est. value
San Bernardino, CA 92410

Fuel Tank Filtering and Cleaning
Term Contract
Post-Bid
Los Angeles, CA 91343

Fuels Tank Inspection EDW
Term Contract
Results
Edwards, CA

Fuel Storage and Station Relocation Project
Infrastructure
Bidding
$361,000 est. value
Chula Vista, CA 91910

Fuel Filtering, Tank Cleaning and Lab Testing
Term Contract
Post-Bid
Long Beach, CA 90822

Diesel Underground Storage Tank Removal
Demolition
Results
Oceanside, CA

Regional Wastewater Control Facility (RWCF) Digester Gas Pipeline Expansion Joints Replacement
Infrastructure
Bidding
$160,000 est. value
Stockton, CA

Maintenance of Natural Gas Pipeline
Alteration
Post-Bid
Herlong, CA 96113

Fuel Pump and Tank Certification Repair Services
Infrastructure
Results
CA

Reported 06/15/2022 10:49 AM
Project Title

Secondary Non-Potable Water Storage Facility - City Of Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct a 1.0 MGD non-potable storage facility for recycled water, including appurtenances such as valves, pipes and associated improvements. It is a requirement from the Central Valley Regional Water Quality Control Board, as part of the WWTP NPDES Permit, that the City must expedite implementation of steps to expand recycled water usage and decrease discharge of treated water into Marsh Creek. As part of this effort, the City needs a storage facility to buffer the daily cyclical difference between recycled water supply and demand. The project is included in the City of Brentwood's FY 2022-2026 Capital Improvement Program (CIP). As of June 14, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents