Similar Projects
IH0010 - Flexible Base
Infrastructure
Bidding
$156,000 est. value
TX

US0059 - Spot Base Repair
Infrastructure
Bidding
$299,125 est. value
TX

Paving, Signage, and Lighting Infrastructure for Pecan Square Phase 2B-3
Post-Bid
Northlake, TX

Overlaying Roads in Precinct 2
Post-Bid
Kountze, TX 77625

Griffing Road Asphalt Resurfacing Project
Results
Beaumont, TX 77701

Spot Base Repair
Results
Less than $292,747 est. value
TX

Construction of Roadway Improvements on CR 193
Infrastructure
Bidding
TX

Trinity Crossing Phase 5B Paving Improvements
Post-Bid
Forney, TX

Road Construction at Neuens Road Between Gessner Road and Blalock Road
Results
Less than $11,788,980 est. value
Houston, TX 77002

Construction of Paving Facilities in Marvida Section 14
Infrastructure
Bidding
$923,000 est. value
TX

Grading of Roads and Shaping of Ditches and Roadway - 307
Post-Bid
Hillsboro, TX 76645

Pavement Repair
Results
Less than $999,206 est. value
TX

IH 10- Hazard Elimination and Safety
Post-Bid
$4,937,382 est. value
TX

Widen from 4 to 6 Lanes Divided
Results
Less than $72,978,375 est. value
TX

Overlaying Roads
Infrastructure
Post-Bid
Kountze, TX 77625

Last Updated 11/05/2021 03:39 AM
Project Title

US 90 - Seal Coat

Physical Address View project details and contacts
City, State (County) TX   (Colorado County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,466,420
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

County Control Limits From Highway Project Limits To Colorado 0026-06-035 Fm 806 Us 90 f 2022(093) 0.056 Mi w Of Front St. Length: 1.4040 Miles Colorado 0027-01-047 0.056 Mi w Of Front St Us 90 f 2022(093) Front St Length: 0.0560 Miles Victoria 0088-05-106 Ss 91 Us 59 f 2022(094) Bu 59t Length: 1.8570 Miles Jackson 0089-03-094 550' w Of Pumphrey St. Us 59 f 2022(094) 350' e Of Cr 116 Length: 0.90 Miles Jackson 0089-03-095 Us 59 Interchange Us 59 f 2022(094) Lavaca River Length: 0.91 Miles Jackson 0089-04-080 1000' w Of Cr 407 Us 59 f 2022(094) 1150' e Of Sh 111 Length: 1.21 Miles Jackson 0089-04-081 1800' e Of Fm 530 Us 59 f 2022(094) 800' e Of Cr 407 Length: 2 Miles Wharton 0089-16-005 Us 59 Sl 526 c 89-16-5 Us 59 (Pierce) Length: 1.2920 Miles Calhoun 0144-04-047 Fm 2433 Sh 238 f 2022(093) Sh 316 Length: 1.5980 Miles Calhoun 0144-05-046 Sh 238 Sh 185 f 2022(093) Railroad Ave Austin 0187-02-069 Fm 2429 Sh 36 f 2022(094) Fm 949 Length: 4.1860 Miles Austin 0187-03-073 Fm 949 Sh 36 f 2022(094) Fm 2187 Length: 5.6260 Miles Austin 0187-04-034 Fm 1952 Sh 36 f 2022(094) Fort Bend c/l Length: 1.8520 Miles Fayette 0211-06-065 Lee c/l Us 77 f 2022(094) 400 Ft n Of Sh 71 n Service Road Length: 11.5450 Miles Fayette 0211-11-003 Us 77 Fm 1482 c 211-11-3 End Of Maintenance Length: 0.3880 Miles Gonzales 0215-12-010 Wilson c/l Fm 1681 f 2022(093) Sh 80 Length: 1.2230 Miles Matagorda 0241-02-055 Fm 3156 Sh 60 f 2022(093) 1.045 Mi s Of Sh 35 Length: 3.3180 Miles Matagorda 0241-03-030 1.045 Mi s Of Sh 35 Sh 60 f 2022(093) 0.46 Mi n Of Fm 2668 Length: 1.4890 Miles Fayette 0265-07-052 Sh 71 Sh 71 f 2022(094) 0.7 Mi e (Lady Bird Loop) Length: 0.7380 Miles Fayette 0265-08-070 2.66 Mi w Of Us 77 (w Interchange) Sh 71 f 2022(094) Us 77 (Frontage Road) Length: 2.34 Miles Fayette 0265-12-004 Sh 71 w Of West Point Sl 543 f 2022(093) Sh 71 e Of West Point Length: 1.6110 Miles Fayette 0265-15-004 Sh 71 w Of Plum Sl 220 f 2022(093) Sh 71 e Of Plum Length: 1.4010 Miles Fayette 0266-01-087 Us 77 Sh 71 f 2022(094) 3.66 Mi e Of Bu 71 Length: 0 Miles Austin 0315-11-011 Fayette c/l Fm 389 f 2022(093) Washington c/l Length: 3.9960 Miles Fayette 0334-08-038 2.70 Mi n Of Fm 2237 (Buckners Creek) Fm 154 f 2022(093) Sh 95 Length: 10.0210 Miles Matagorda 0346-03-034 Sh 71 Fm 2431 f 2022(093) Fm 1468 Length: 8.8160 Miles Jackson 0346-07-041 3.388 Mi s Of Lavaca c/l Sh 111 f 2022(093) Us 59 Length: 12.77 Miles Matagorda 0346-12-010 Sh 71 Fm 456 c 346-12-10 End Of Maintenance Length: 2.5490 Miles Jackson 0420-02-050 Fm 616 Sh 172 f 2022(093) Calhoun c/l Length: 9.6690 Miles Calhoun 0432-01-068 Sh 35 Sh 185 f 2022(093) Sh 238 Length: 5.3510 Miles Lavaca 0446-01-052 Fm 2314 Ua 90 f 2022(093) Fm 3283 Length: 7.7390 Miles Colorado 0446-02-039 0.27 Mi w Of Skull Creek Ua 90 f 2022(093) Sh 71 Length: 2.4240 Miles Matagorda 0497-01-021 Fm 1862 Fm 616 f 2022(093) Sh 35 Length: 2.6670 Miles Lavaca 0515-04-035 Fm 2437 Fm 530 f 2022(093) Jackson c/l Length: 6.0670 Miles Fayette 0535-06-047 Gonzales c/l Ih 10 f 2022(094) 0.25 Mi w Of Fm 2238 (Fr Rd) Length: 5.1560 Miles Fayette 0535-07-052 0.25 Mi w Of Fm 2238 Ih 10 f 2022(094) Colorado c/l Length: 5.6690 Miles Colorado 0709-01-026 Senior Bridge Rd Fm 102 f 2022(093) Wharton c/l Length: 5.1020 Miles Gonzales 0839-01-018 Us 90a Fm 443 f 2022(093) De Witt c/l Length: 8.9180 Miles Victoria 0840-01-016 Us 59 Fm 444 f 2022(093) 6.16 m e Of Fm 1686 Length: 6.0930 Miles Victoria 0840-05-022 Us 77 Fm 444 f 2022(093) Us 59 Length: 17.62 Miles Colorado 0897-02-023 Sh 71 Fm 950 f 2022(093) Fm 102 Length: 6.3470 Miles Jackson 1090-01-026 Lavaca c/l Fm 530 f 2022(093) Bagby Rd (Cr 274) Length: 10.8550 Miles Austin 1106-02-022 Colorado c/l Fm 949 c 1106-2-22 Sh 36 Length: 11.5550 Miles Gonzales 1133-02-033 Us 90 Fm 794 f 2022(093) Cr 235 Length: 4.17 Miles Wharton 1260-02-017 Sh 71 Fm 1163 c 1260-2-17 Fm 441 Length: 8.5860 Miles De Witt 1263-01-013 Us 87 Fm 953 c 1263-1-13 Fm 766 Length: 6.5540 Miles Wharton 1304-01-020 Fm 653 Fm 1162 f 2022(093) Matagorda c/l Length: 16.22 Miles Gonzales 1442-03-020 Us 90 Fm 1680 f 2022(093) Lavaca c/l Length: 9.5240 Miles Lavaca 1442-04-011 Gonzales c/l Fm 1680 f 2022(093) Fm 532 Length: 2.8550 Miles Calhoun 1688-01-011 .19 Mi w Of Fm 2433 Fm 1679 c 1688-1-11 Sh 35 Length: 4.4720 Miles Matagorda 1985-02-005 End Of State Maintenance Fm 2175 c 1985-2-5 Fm 1468 Length: 2.12 Miles Lavaca 2063-04-004 Us 90a Fm 3283 c 2063-4-4 End State Maintenance Length: 3.9740 Miles Victoria 2350-01-067 n Of Coletoville Rd e Us 77 f 2022(094) Us 59t Length: 0.9520 Miles Victoria 2516-01-011 6.16 Mi e Of Fm 1686 Fm 444 f 2022(093) Fm 1686 Length: 6.0160 Miles Wharton 2517-01-038 End Of Maintenance Fm 2546 c 2517-1-38 Sh 71 Length: 7.4940 Miles Matagorda 2525-02-007 Fm 457 Fm 2540 c 2525-2-7 Fm 521 Length: 7.4280 Miles Colorado 2599-01-009 Fm 950 Fm 2614 f 2022(093) Wharton c/l Length: 2.7360 Miles Calhoun 2714-02-005 Fm 2717 Fm 2760 c 2714-2-5 Intersection At Fm 2760 Length: 1.8880 Miles Calhoun 2714-03-005 Sh 316 Fm 2760 c 2714-3-5 End Of Maintenance Length: 0.9970 Miles De Witt 2716-01-008 Us 183 Fm 2718 c 2716-1-8 Fm 237 Length: 8.4090 Miles Gonzales 2828-01-006 Sh 97 Fm 2814 c 2828-1-6 End Of State Maintenance Length: 5.6180 Miles Calhoun 2914-01-005 Sh 35 Fm 2541 c 2914-1-5 Sh 238 Length: 4.6260 Miles Fayette 3109-03-004 End Of State Maintenance Fm 3011 c 3109-3-4 Fm 2145 Length: 3.2480 Miles Austin 3205-01-013 Sh 36 Fm 3013 f 2022(092) Colorado c/l Length: 8.3860 Miles Item Des Approximate Alt No. Cd. Item Description Unit Quantities Bid Price Amount Seq 316 6004 Asph (Tier i) Gal 910,840.000 1 316 6005 Asph (Tier Ii) Gal 1,758,174.000 2 316 6017 Asph (Ac-20-5tr) Gal 195,795.000 3 316 6246 Aggr(Ty-Pe Gr-3 Sac-b) Cy 49,123.000 4 316 6249 Aggr(Ty-Pe Gr-4 Sac-b) Cy 12,988.000 5 500 6001 Mobilization Ls 1.000 6 502 6001 Barricades, Signs And Traffic Handling Mo 5.000 7 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 6,653.000 8 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty y-2 Ea 47,596.000 9 666 6030 Refl Pav Mrk Ty i (w)8"(Dot)(100mil) Lf 5,459.000 10 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 26,406.000 11 666 6138 Refl Pav Mrk Ty i (y)8"(Sld)(100mil) Lf 775.000 12 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 51,444.000 13 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 1,245,605.000 14 666 6312 Re Pm w/Ret Req Ty i (y)4"(Brk)(100mil) Lf 143,499.000 15 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 650,739.000 16 666 6342 Ref Prof Pav Mrk Ty i(w)4"(Sld)(100mil) Lf 1,849,432.000 17 666 6344 Ref Prof Pav Mrk Ty i(y)4"(Brk)(100mil) Lf 187,563.000 18 666 6345 Ref Prof Pav Mrk Ty i(y)4"(Sld)(100mil) Lf 847,291.000 19 668 6074 Prefab Pav Mrk Ty c (w) (12") (Sld) Lf 1,256.000 20 668 6075 Prefab Pav Mrk Ty c (w) (18") (Sld) Lf 4,995.000 21 668 6076 Prefab Pav Mrk Ty c (w) (24") (Sld) Lf 6,611.000 22 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 73.000 23 668 6085 Prefab Pav Mrk Ty c (w) (Word) Ea 46.000 24 668 6089 Prefab Pav Mrk Ty c (w) (Rr Xing) Ea 18.000 25 668 6091 Prefab Pav Mrk Ty c (w) (18")(Yld Tri) Ea 359.000 26 668 6092 Prefab Pav Mrk Ty c (w) (36")(Yld Tri) Ea 46.000 27 668 6108 Prefab Pav Mrk Ty c (y) (24") (Sld) Lf 1,073.000 28 672 6007 Refl Pav Mrkr Ty i-c Ea 4,640.000 29 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 35,691.000 30 6001 6002 Portable Changeable Message Sign Ea 1.000 31 6056 6001 Preformed In-Lane(Trans) Rumble Strip Lf 72.000 32 6185 6002 Tma (Stationary) Day 25.000 33 6185 6005 Tma (Mobile Operation) Day 150.000 34

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents