Similar Projects
Flightway Sixteen Development
New Construction - 100,056 SF
Conception
$10,000,000 CJ est. value
Doral, FL

Extra Space Storage
New Construction - 142,530 SF
Conception
$20,000,000 est. value
North Bay Village, FL

Extra Hand Storage
New Construction - 144,836 SF
Design
$10,000,000 CJ est. value
Miami, FL

TopFlite Components
New Construction - 12,000 SF
Design
$1,100,000 est. value
Homestead, FL

Extra Space Storage
New Construction - 51,298 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33173

Got Room Self Storage
New Construction - 121,969 SF
Post-Bid
$10,000,000 CJ est. value
Miami, FL 33442

Cubesmart Self Storage
New Construction - 228,000 SF
Construction
$15,000,000 est. value
Miami, FL

Megacenter Brickell
New Construction - 145,674 SF
Construction
$26,000,000 est. value
Miami, FL

Gold Coast Headquarters
Renovation - 4,726 SF
Pending Verification
Less than $500,000 CJ est. value
Miami, FL

Gratigny Logistics Center
New Construction - 893,070 SF
Conception
Miami, FL

Prologis Beacon Lake - Building 37
New Construction - 169,397 SF
Design
$10,000,000 est. value
Miami, FL

Biltmore Golf Facility
New Construction - 1,295 SF
Post-Bid
$80,000 est. value
Coral Gables, FL 33134

Camilo Mini Storage
Renovation, Demolition
Construction
$500,000 to $1,000,000 CJ est. value
Miami, FL

Self-Storage Facility
New Construction - 70,648 SF
Conception
Miami, FL

Countyline Corporate Park - Building 8 - Spec Space
New Construction, Build-Out - 67,536 SF
Post-Bid
Hialeah, FL

Last Updated 01/30/2019 12:59 PM
Project Title

John E. Preston Water Treatment Bulk Sodium Storage Facility

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33010   (Miami-Dade County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,666,249
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Miami-Dade Water and Sewer Department (MDWASD) is soliciting competitive bids to construct a Bulk Sodium Hypochlorite Storage (BSHS) facility at the John E. Preston (Preston) Water Treatment Plant (WTP). The new facility will serve and meet both the Preston and Hialeah WTPs chlorine demands. Sodium hypochlorite will be stored in three lined concrete tanks located in Preston WTP and transferred to the Hialeah WTP via a redundant pipeline running through an existing concrete chase structure to existing day tanks as per needed basis. Sodium hypochlorite will be delivered via rail-car and tanker trucks to the BSHS facility with a storage capacity/duration of 14 days. The Specifications included in these Contract Documents establish the performance and quality requirements for material and equipment and the minimum standards for the construction and testing of the bulk sodium hypochlorite storage facility.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents