Similar Projects
Dock & Shed Rehab
Alteration
Design
$1,000,000 to $5,000,000 est. value
Bayfield, WI

Low Impact Design Improvements Woodstock Bay Project
Infrastructure
Bidding
Superior, WI 54880

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Cotton Mill Park Fishing Platforms and Kayak Launch
Addition
Results
Beaver Dam, WI 53916

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Fountain City Service Base Phase II Design Build
Post-Bid
Fountain City, WI

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Hubbard Park Canoe and Kayak Launch
Infrastructure
Post-Bid
Shorewood, WI 53211

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Deck Replacements - Single Family Homes - USCG Housing Sturgeon Bay, Wisconsin
Term Contract
Post-Bid
Sturgeon Bay, WI 54235

Pier 1 Water and Decking
Results
Washburn, WI 54891

Pier and Buoy Maintenance
Term Contract
Post-Bid
Lake Geneva, WI

Columbus - Watertown, Beaver Dam River
Results
WI

Flood Repair Dockside
Infrastructure
Post-Bid
Milwaukee, WI

Last Updated 03/22/2022 10:43 AM
Project Title

Ship Lift Electrical And Control Building

Physical Address View project details and contacts
City, State (County) Marinette, WI 54143   (Marinette County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 to $3,200,000
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides the infrastructure for the electrical power and controls distribution for the ship lift system. A new ship lift control building is required inclusive of building structure and environmental systems. The control building is a two-story structure with a basement wiring vault underneath. The first floor contains electrical equipment to serve ship lift, pier power and shore-to-ship power. The second floor is a control room for operation of the ship lift system. This bid shall include installation of the ship lift motor control center and providing and installing power / control cabling for the ship lift system. Distribution of ship lift cabling and miscellaneous power to the pier will be required and new cable trays and sleeves installed in piers and trenches.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents