Last Updated | 03/09/2023 06:37 AM |
Project Title | North and South Parking Garages, Phase 3 Repairs |
Physical Address | View project details and contacts |
City, State (County) | Storrs Mansfield, CT 06269 (Tolland County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Parking Garage |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $713,459 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Repairs that will be required as part of this phase include the following: - Replacement of joint sealants that have reached the end of their service life to include removal of existing sealants, cleaning of adjacent surfaces, preparation of adjacent surfaces, and installation of new sealants. - Repair of deteriorated or damaged concrete on floors, beams, columns, walls, curbs, and stairs to include removal of deteriorated or damaged, concrete, preparation of surfaces, and installation of concrete patch. - Repair and/or sealing of cracks using epoxy injection or other specified techniques. - Repair or replacement of shear connectors. - Miscellaneous cleaning and repairs of drainage system. RFI Deadline Date: 02/17/2023 2:00 PM Only previously prequalified contractors may submit a Bid for this Project. Liquidated Damages of Five Hundred Dollars ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time. The "Set-Aside" Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors The University reserves the right to reject any or all Bids, in whole or in part, to award any item, group of items, or total bid; and to waive any informality or technical defects; if it is deemed to be in the best interest of the University. All Requests for Information ("RFI") questions are to be posted under the Q & A Board Tab in the HuskyBuy sourcing event for this Project. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. The University of Connecticut owns two precast concrete parking garages at the Storrs Campus. The North Garage is a five-level structure constructed in 1997. The South Garage is a six-level structure constructed in 2000. Access to the South Garage is provided at the ground level and at the fifth level. The University commissioned a condition assessment and structural evaluation for each garage, which concluded that, while the structures are both in good condition, certain repairs were recommended. The University has utilized a phased approach to completing the repairs. This project compromises the third phase of the repairs and will focus primarily on the lower and mid-levels of each of the two garages at the Storrs Campus 103 N. EAGLEVILLE ROAD STORRS, CT 06269 2366 JIM CALHOUN WAY STORRS, CT 06269 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |