Similar Projects
Classroom Renovation
Renovation
Bidding
Suttons Bay, MI

BP 4 South Hills Middle School
New Construction
Bidding
Bloomfield Hills, MI

High School Grandstand and Restroom Renovation
Renovation
Post-Bid
Allendale, MI

Clarkston 2016 Bond Projects - Bid Package 9
Post-Bid
Clarkston, MI

Construction Management Services
Results
Ann Arbor, MI

Building Remodeling Projects at: Fort Gratiot Middle School and Roosevelt Elementary School - Bid Package 11
Renovation
Results
Fort Gratiot, MI 48060

Renovations to District Offices at Liberty School
Renovation
Construction
Saline, MI

High School - Middle School Classrooms
Renovation - 57,600 SF
Construction
$1,500,000 to $2,000,000 est. value
Muskegon, MI 49441

2020 Sinking Fund Projects
Renovation
Bidding
Walkerville, MI

Center Line High School Renovations
Renovation
Post-Bid
Center Line, MI

Summer Renovations
Results
Ann Arbor, MI

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Alternative Education Center Renovations
Renovation
Post-Bid
Center Line, MI

Clarenceville Schools: Bathroom Renovations
Results
Livonia, MI

BP 6A Concession Building and Dugouts
Post-Bid
Ypsilanti, MI

Reported 06/26/2021 12:00 AM
Project Title

Bay City Academy Kitchen Remodel

Physical Address View project details and contacts
City, State (County) Bay City, MI 48708   (Bay County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a commercial kitchen at 301 N. Farragut Street, Bay City 48708. Qualified proposals must address the following: Supply labor, materials and equipment to complete the following breakdown of work: Purchase and installation of stainless steel work table with 12” deep prep sink and heavy duty faucet with deck mount, 10” swing spout and adjustable undershelf and drawer. Purchase and installation of stainless steel overshelf approximately 60”w x 12”d. Purchase and installation of wall mounted stainless steel hand sink with gooseneck heavy duty faucets and wrist blades. Purchase and installation of 1000 watt medium duty microwave with stainless steel door and warranty. Purchase and installation of three compartment stainless steel sink with heavy duty faucet and twist handle lever waste and basket strainer. Purchase and installation of stainless steel wall mounted microwave shelf with electric cord cutout. Purchase and installation of wall-mounted stainless steel shelving. Installation of commercial grade ice maker with bin, water filtration system and parts and labor warranty. Purchase and installation of floor mounted mop sink with heavy duty service faucet hose, skirted sides, service faucet with vacuum breaker and utility tool holder with warranty. Purchase and installation of dry shelving for food storage. Removal and disposal of one door and its hardware; existing VCT and base in vestibule, janitors closet and kitchen; remove existing cabinets; remove existing acoustical panels on the vestibule ceiling; sawcut, remove and repair concrete floor for new grease trap. Install two new doors and hardware into existing frames; install 64 square foot FRP adjacent to new mop sink. Install new drywall in vestibule ready for paint; paint existing walls and ceilings in vestibule, janitor closet, kitchen/closet; paint new doors and existing frames. Install new VCT in vestibule, and kitchen/closet. Install new grease trap. Install Six (6) 120 volt duplex outlets along the kitchen. Install two (2) 120 volt duple outlets. Install new emergency light. Install 120 volt 30 amp outlet for steam table in gym. Install two (2) 120 volt outlets in vestibule. Install 120 volt 20 amp for ice maker. Replace the vestibule light with new 4” LED light. Install 120 volt outlets in kitchen. install 120 volt outlet for microwave in kitchen. Install new lights in kitchen. Surface mount EMT conduit. Removal and disposal of all existing items that are replaced. Provide to owner a 15 year materials and labor warranty. Dispose of all job debris in accordance with all local, state and federal regulations. Permits, supervision/layout, dust protection, dumpsters, general and final clean-up of site. Include all taxes and insurances in the proposal.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents