Similar Projects
Roster of Architectural and Engineering Firms
Infrastructure
Bidding
WA 98203

Mechanical Engineering and Design Services for Annex Hvac System Replacement
Renovation, Term Contract
Bidding
Tacoma, WA 98405

Professional Engineering, Architectural And Land Surveying Services - Sultan School District
Renovation, Infrastructure, Alteration
Post-Bid
Sultan, WA 98294

Surveying and Mapping for Future Waterline Replacement Projects
Alteration
Post-Bid
Index, WA 98256

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Design Services, Snohomish River Bridge #1 Scour Mitigation
Term Contract
Bidding
Snohomish, WA 98296

Irrigation Design, SR 530 Slide Memorial
Alteration
Post-Bid
WA

Port Gardner Storage Facility
New Construction, Infrastructure
Results
Everett, WA 98213

On Call Consultant Services
Term Contract
Bidding
WA

Capital Planning Consulting, Architectural, Engineering, Environmental, & Archaeology Services
Renovation, Term Contract
Post-Bid
Tulalip Bay, WA 98271

Central Marina Fuel Dock Design
New Construction, Infrastructure
Results
Everett, WA 98213

Design - Transit Connection Corridor Project
Infrastructure
Bidding
Mountlake Terrace, WA

Waterfront Place Development Phase II Housing & Commercial Opportunities
New Construction, Infrastructure
Post-Bid
Everett, WA 98213

Scriber Lake Park Boardwalk Trail Design
New Construction, Infrastructure
Results
Lynnwood, WA 98036

Last Updated 04/26/2022 08:52 AM
Project Title

Chennault Beach Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Mukilteo, WA 98275   (Snohomish County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Mukilteo is requesting qualifications (RFQ) from qualified professionals or firms to provide professional services for the design and engineering of the Chennault Beach Drive Drainage Improvements project, with the option of construction management and inspection services. The proposed improvements include installation of new drainage pipes within the existing roadside ditches; relocation of misplaced existing inlets; minor shoulder paving and asphalt curbing; re-establishment of ditch capacity; assessment, and potentially replacement, of existing driveway culverts; geotechnical investigation of existing retaining walls and the possible presence of unsuitable materials; and environmental permitting and documentation. The design and construction phases of this project will be funded by local funds. All aspects of this project will need to comply with the requirements of the funding agency, at a minimum. The major features of the project are as follows: Engineering & Design, Environmental Permitting and Documentation (SEPA), Public Outreach (Optional), Construction Management & Inspection (optional).

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents