Similar Projects
Region 4,GSA PBS, Design-Build Concrete and Crack Water Fountain Repairs, Fort Lauderdale, FL
Design
$500,000 to $1,000,000 est. value
Fort Lauderdale, FL 33301

Citywide Concrete Construction, Installation, Repair and/or Replacement services
Bidding
Punta Gorda, FL

Concrete Flowable Fill Annual Supply Contract
Term Contract
Bidding
$80,000 est. value
Vero Beach, FL

Concrete Driveway Apron and Collar Restoration
Term Contract
Post-Bid
Okeechobee, FL 34972

Pensacola International Airport Terminal Joint Repairs
Post-Bid
Pensacola, FL 32502

Reinforced Concrete and Related Services: Supply and Install
Term Contract
Results
FL

Concrete Flowable Fill
Results
Palm Bay, FL 32907

Ready-Mix Concrete and Concrete Block
Term Contract
Post-Bid
Bradenton, FL 34205

MC Baseline Landfill Freezer Slab
Results
Ocala, FL 34480

Target #T0642 - Parking Lot Rehabilitation
Post-Bid
Delray Beach, FL 33444

Portland Cement Concrete and Reclaimed Concrete Disposal
Results
Palatka, FL 32177

Concrete Flatwork
Post-Bid
Less than $800,000 est. value
FL

Concrete Repair (BDI)
Results
Less than $60,000 est. value

Ralph Richards Tower Patio Slab Renovation
Post-Bid
Clearwater, FL 33756

Recycled Crushed Concrete, Delivered
Results
Less than $100,000 est. value
Tampa, FL 33601

Last Updated 01/25/2021 09:19 AM
Project Title

Solid Waste Transfer Station - Drive Thru Lane and Wash Rack Reconstruction

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32304   (Leon County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform the following repairs to Solid Waste Transfer Station: Replace the failed concrete Drive-Thru Lane portion of the building floor, remove/repair/replace damaged and/or missing steel & concrete at the Push Wall of Tipping Floor, modify existing exit ramp of Wash Rack to eliminate all conflicts by CNG fuel tanks located in the undercarriage of City of Tallahassee trash trucks; work will also include providing a temporary doorway opening in the side of building, constructing a temporary access drive to interconnect with the temporary opening, maintenance of traffic on facility grounds and inside of Transfer Station building during construction as a phased operation (including all of the required labor for flagmen & spotters), possible unsuitable soil replacement beneath floor slab, possible additional steel & concrete repairs since development of plans & specs and the possible additional partial reconstruction of portions of Wash Rack due to concealed conditions in underlying structure. Contractor will be required to perform heavy demo, removal & disposal of materials, along with torching, grinding & welding in the occupied building with combustible materials present, placing concrete forming and materials, they will also be tasked with reconstructing a portion of the leachate collection system “floor drains” cast into floors that are a crucial component of this industrial trash handling operation. Upon completing construction, the temporary access door shall be closed, the temporary drive removed and all disturbed areas of the building & grounds restored to a “like or better” condition.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals.
Division 11 - Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents