Similar Projects
Brightwater Aeration Basin Optimization
Infrastructure
Design
$5,500,000 est. value
WA

Lake Hills and NW Lake Sammamish Interceptor Upgrade
Infrastructure
Design
$70,000,000 est. value
WA

Fall City Floodplain Restoration Project
Infrastructure
Post-Bid
$9,715,074 est. value
Fall City, WA 98024

Sammamish River Cis
Alteration
Post-Bid
$1,200,000 est. value
WA

Quillayute River Restoration
Term Contract
Results

South Renton Transit Center Remediation Project
Infrastructure
Results
$3,300,000 est. value
Renton, WA 98057

The Firs At Talus
New Construction, Infrastructure
Construction
Issaquah, WA 98027

Herzman Levee Setback Construction
Infrastructure
Design
$4,200,000 est. value
WA

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Mitigation Fairwood - 4 Phase - 2 Molasses Creek
Infrastructure
Design
WA

Environmental Remediation Construction - Unit Priced Contract 2
Term Contract
Post-Bid
Less than $2,000,000 est. value
Seattle, WA

Lake Hills Interceptor Phase II
Alteration
Design
$13,330,000 est. value
WA

Fountain Ilse D91126
Infrastructure
Design
$300,000 est. value
WA

Madsen Dam DR0642
Infrastructure
Design
$300,000 est. value
WA

Brps Seismic Upgrades
Infrastructure
Design
$14,000,000 est. value
WA

Last Updated 07/20/2022 12:19 AM
Project Title

Sunset Playfield Soil Remediation

Physical Address View project details and contacts
City, State (County) Seattle, WA 98168   (King County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $1,012,206 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the improvement of the Sunset Playfield in SeaTac in King County to clean-up soil that was contaminated by Asarco's Tacoma Smelter. The project workers must have current Hazardous Waste Operations and Emergency Response (HAZWOPER) Training Certification. The project includes excavating and disposing of contaminated soils, capping and restoring baseball field areas, and other work.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents