Similar Projects
18th Street Alley Improvements and Central Court Resurfacing
Infrastructure
Bidding
Homewood, AL 35209

Standard Patch Paving/Longitudinal Transverse/ Mill and Resurfacing
Post-Bid
Birmingham, AL 35222

Annual Asphalt and Roadway Repair
Post-Bid
Less than $100,000 est. value
Adamsville, AL

Southern Region Disaster Recovery Support BPA
Results

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

Street Resurfacing
Results
$658,826 est. value
Mountain Brook, AL 35213

18Th Place South Improvements
Post-Bid
Homewood, AL

Runway 18-36 and Taxiway `G` Pavement Rehabilitation
Results
$8,500,000 to $8,900,000 est. value
Birmingham, AL

Homewood Public Library Parking Lot Paving
Infrastructure
Post-Bid
Homewood, AL 35209

Bessemer Street Patching 2020
Results
Less than $663,000 est. value
Bessemer, AL 35020

Farmers Market Access Road Improvements
Infrastructure
Post-Bid
Birmingham, AL

Constructing the Pavement Preservation (Micro-Milling, Resurfacing, and Traffic Stripe)
Results
$14,339,062 to $17,525,520 est. value

Asphalt (Emulsified)
Term Contract
Post-Bid
Birmingham, AL

Constructing the Planing, Resurfacing, and Traffic Stripe
Results
$1,788,550 to $2,186,005 est. value
Adamsville, AL 35005

Last Updated 12/03/2021 09:50 AM
Project Title

City Wide Resurfacing 2021

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,990,665
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes Resurfacing (Milling Asphalt and Asphalt Seal), Curb Ramps, Pavement Markings, Video Detection Cameras The approximate principal materials and quantities are as follows: Mill 1.5" - 385,000 SY, Asphalt Seal - 36,000 Tons, ADA Curb Ramps - 200 Each, 8" Concrete Paving - 550 SY, Video Detection - 7 Cards / 16 Cameras, Striping (Thermo) - 12 Miles, Markings (Thermo) - 18,000 SF, 75 Bike Lane.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents