Similar Projects
Crack Sealing - D05 CS FY2021
Bidding
Buckeye Lake, Corning, Hebron, Nellie, Rendville, Warsaw, OH

Asphalt Resurfacing of TJ Evans Bike Trail 2021
Bidding
Granville, OH 43023

Schuster Way and SR 310 Improvements
Post-Bid
$3,333,974 est. value
Etna, OH 43018

2020 Road Repair Project
Post-Bid
Utica, OH 43080

Enterprise/O`Neill Drive Roadway Improvements
Results
Less than $564,229 est. value
Hebron, OH 43025

Interchange - SR 37/SR 661-16.59/00.00
Results
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

Road Repair
Post-Bid
OH

Crack Sealing - CS FY2020
Results

Township Road Improvements for 2020
Post-Bid
Johnstown, OH 43031

2020 Roadway Improvements
Results
Less than $893,017 est. value
Hanover, OH 43055

Resurfacing of Tagg Road
Post-Bid
Hartford, OH

2020 Trench Repair/ Paving Project
Results
Less than $101,000 est. value
Buckeye Lake, OH 43008

Mary Ann and Eden Township Resurfacing Project
Post-Bid
Hanover, OH 43055

2020 Street Paving
Results
$1,207,963 est. value
Heath, OH 43056

Reported 06/04/2020 12:00 AM
Project Title

2020 Road Paving

Physical Address View project details and contacts
City, State (County) Newark, OH 43056   (Licking County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface the following roads with Item 441 Asphalt Concrete Surface Course, Type 1, 448, PG64-22 1": 1. Bolen Road: Montgomery Road to Licking Valley Road, 0.98 miles (5,155') 20' width avg. 2. Beal Road: Township Line to Staddens Bridge Road, 1.64 miles (8,650') 18' width avg. Resurface the following roads with Item 441 Asphalt Concrete Surface Course, Type 1, 448, PG64-22 1.5": 1. Stewart Road: Township Line to SR 79, 0.70 miles (3,700') 20' width avg. 2. Neibarger Lane: Dayton Road to Dead End, 0.42 miles (2,196') 15' width avg. 3. Cross Road: Sleepy Hollow Road to Beal Road, 1.27 miles (6,680') 16' width avg. NOTE: Madison Township reserves the right to individually accept or reject the bid for each road listed above.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents