Similar Projects
Air Park Recreation Center Replacement Facility - City of Lincoln
Addition, Infrastructure
Conception
$933,182 CJ est. value
Lincoln, NE 68524

Multi Modal Center - City of Lincoln
New Construction, Infrastructure
Conception
$528,979 CJ est. value
Lincoln, NE 68508

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Monolith Materials Anhydrous Ammonia Plant - Phase 2
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000,000 CJ est. value
Hallam, NE 68368

I-80, Utica - Lincoln
Infrastructure
Post-Bid

Arnold Heights Concrete - 2022
Infrastructure
Post-Bid
$30,000 CJ est. value
Lincoln, NE 68508

North 140th Street Improvements
Infrastructure
Results
Waverly, NE 68462

LPS - South 70th and Carger Lane Public Infrastructure
Infrastructure
Results
Lincoln, NE 68516

Southeast Community College Residence Hall - Lincoln Campus
New Construction, Infrastructure - 89,780 SF
Construction
$25,000,000 CJ est. value
Lincoln, NE 68520

South 59th Circle Mixed-Use / Lincoln
New Construction, Infrastructure - 130,000 SF
Pending Verification
$60,000,000 CJ est. value
Lincoln, NE 68516

17th & Holdrege Transformer #2 - SUB410 - City of Lincoln
New Construction, Infrastructure
Pending Verification
$3,204,000 CJ est. value
Lincoln, NE 68508

20th & Pioneers Substation Replace Transformer - 0693 - City of Lincoln
New Construction, Infrastructure
Conception
$1,064,000 CJ est. value
Lincoln, NE 68502

New Central Library - City of Lincoln
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Lincoln, NE 68508

On-Call Street Cut Repair Services
Infrastructure
Post-Bid
Lincoln, NE

Compost Facility Pavement Improvements
Infrastructure
Results
Lincoln, NE 68517

Last Updated 05/24/2023 03:27 PM
Project Title

Lincoln East Beltway Project

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68528   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2031
Bids Due View project details and contacts
Estimated Value $350,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The East Beltway project consists of a 4-lane roadway designed to freeway standards, similar an Interstate. The general alignment for the East Beltway runs from I-80 east of the Highway 6 interchange to Nebraska Highway 2 approximately along the 127th Street alignment. As of September 23, 2021, this project is in the conceptual phase. The project is pending funding for construction. An engineer has not been selected. A firm timeline for construction has not been established, but not likely to start prior to 2049.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents