Similar Projects
Harrison Regional Industrial Park
New Construction
Conception
$6,600,000 est. value
Clarksburg, WV 26301

Fairmont Coke Works-Sharon Steel Redevelopment
Infrastructure
Bidding
Fairmont, WV

East Fairmont Junior High Improvements
Infrastructure, Alteration
Bidding
Fairmont, WV

Vernicks Road
Post-Bid
WV

Redevelopment of Property 1315 -1317 Washington Street East 1324 Lee Street East
Post-Bid
Charleston, WV 25301

Triadelphia ATV Resort Route 80 Relocation - Contract #1
Renovation - 1,650 SF
Results
Triadelphia, WV

Site Development - Facility Expansion Project
Results
Summit Point, WV

Excavation Work and Relocation of Water Main
Infrastructure
Bidding
Spencer, WV

Redevelopment of Property 1341 Washington Street East
Infrastructure
Post-Bid
Charleston, WV 25301

Site Development
Alteration
Results
WV

Exit 1 Development
Infrastructure
Bidding
Bluefield, WV

Property Redevelopment
Infrastructure
Post-Bid
Charleston, WV 25311

I-70 Mining - Panels 20
Infrastructure
Results
WV

Raymond Stoaks Plaza Revitalization Plan
Infrastructure
Post-Bid
Follansbee, WV

Mass Site Grading for Glade Creek
Infrastructure
Results
Summersville, WV 26651

Last Updated 11/17/2021 09:05 AM
Project Title

DFM Coal, LLC S-4004-01 OSR Land Reclamation Project

Physical Address View project details and contacts
City, State (County) WV   (Mingo County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform all operations necessary for: clearing and grubbing at the valley fill #3 site and burning the cleared and grubbed material to ash and removing all debris, trash, and garbage; construction, installation and maintenance of support areas and access roads to the site; rehabilitation and cleaning of sediment control channels, to also include outlet rip-rap in select areas; Regrading of valley fill face and transport of approximately 700,000 cyds of mis-placed Valley Fill 3 material into adjacent hollow. Removal of 2000 cyds sediments from Pond K; backfill of approximately 3600 LF (0.68 miles) of mining highwall, ranging from 56 to 150 feet in height, to include some blasting. Total highwall backfill of approximately 650,000 cyds; construction of valley fill groin ditches, drainage flumes and diversion ditches; erosion and sediment control with best management practices to include silt fence, rock check dams, sumps, and rocked outlet protection; revegetation of disturbed areas. The DFM Coal, LLC permit S-4004-01 project area is located in Mingo County, WV, approximately 4 miles due south from Rt. 44 intersection with US Rt. 52 at Mountain View. The project will involve but is not limited to the construction of mining highwall backfill (including blasting), valley fill regrade and access road, sediment structure cleaning, diversion channels and general site reclamation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents