Reported 02/22/2020 12:00 AM
Project Title

Wolf Lake Middle School HVAC and Controls Upgrades

Physical Address View project details and contacts
City, State (County) Orlando, FL 32800   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: refurbishment of cooling towers, termination of chilled water piping to the adjacent elementary school, renovation of the chemical treatment system, replacement of chilled water valves at all AHUs, replacement of VFDs, replacement of chilled water pumps, complete replacement of the entire BAS system, and installation of a radio enhancement system. Goal LDB:10% VBE:3%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents