Similar Projects
Brifen Cable Barrier Parts
Term Contract
Sub-Bidding
Frankfort, KY 40601

Demo of Pool Locker Room and Restroom at East Frankfort Park
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Frankfort, KY 40601

Residential Sound Insulation Program
Post-Bid
Louisville, KY

Asbestos Lead Maintenance Contract at Various Schools
Alteration
Post-Bid
Louisville, KY

Hazardous Gas Detection System
Infrastructure
Results
Lexington, Nicholasville, KY 40356

Hazardous Gas Detection System
Infrastructure
Results
Lexington, Nicholasville, KY 40356

Demolition - UKREC (Princeton)
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Princeton, KY 42445

Abatement of Rubberized Gym Flooring - Phase C
Alteration
Post-Bid
Frankfort, KY

Covington Central Riverfront (CCR) Demolition and Abatement
Demolition, Alteration
Results
Covington, KY 41011

Coarse Aggregates
Term Contract
Sub-Bidding
Frankfort, KY 40601

Grease Trap And Septic Tank Services
Term Contract, Alteration
Post-Bid
Lexington, KY

Asbestos Abatement at Tates Creek High School - Phase 2
Alteration
Results
Lexington, KY 40517

Mowing Services
Term Contract
Sub-Bidding
Owensboro, KY 42303

Sale of Surplus Mulch
Term Contract
Post-Bid
Covington, KY

Granular Activated Carbon - Custom Reactivation or Virgin
Term Contract
Results
Fort Thomas, KY 41075

Last Updated 01/12/2023 10:16 AM
Project Title

Old Power Plant Demo

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $106,993 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolish existing abandoned power plant building and associated components. Demolition of two ancillary structures across the street and partial site stair removal. Coordinate street closure and traffic re-routing with specified parties and authorities. Abatement of hazardous materials per the referenced report. Building new CMU walls in the existing tunnel to block access. Provide new gravel lot in area of demolished building. Add Alternate 1 Remove existing piping in the tunnel between new concrete masonry unit (CMU) walls. Service Start : 12/20/2022 Service End : 2/15/2023 2. Substantial Completion is defined as the project is sufficiently complete, in accordance with the construction contract documents, so that the owner may use or occupy the structure for its intended purpose without affecting daily operation. 3. The time for Contract Completion is 28 Calendar Days beyond Substantial Completion date.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents