Similar Projects
Venture Academy Middle School
Build-Out
Conception
Minneapolis, MN

Rice Creek Commons
New Construction - 2,250,400 SF
Conception
$750,000,000 est. value
Arden Hills, MN 55112

Ninth Elementary Addition
New Construction
Design
$28,900,000 est. value
Lakeville, MN 55044

North Hennepin Community College Site
New Construction
Design
$20,400,000 est. value
Brooklyn Park, MN 55445

Construction Manager - Independent School District 272 Eden Prairie Athletic Storage Bldg
Renovation
Bidding
$500,000 est. value
Eden Prairie, MN

Bloomington Schools - Oak Grove Middle School Maintenance Garage Floor Remediation
Renovation
Bidding
$140,000 est. value
Bloomington, MN 55431

New Elementary No. 9 Bid Package C
New Construction - 100,000 SF
Sub-Bidding
$22,000,000 est. value
Lakeville, MN 55044

ISD 194 New Elementary School - Bid Package C
New Construction, Infrastructure - 100,000 SF
Sub-Bidding
$1,000,000 est. value
Lakeville, MN 55044

White Bear Lake Area High School North Campus Addition & Renovation
Post-Bid
Saint Paul, MN 55110

East Grand Forks Public Schools 2021 Improvements
Renovation
Post-Bid
East Grand Forks, MN

Waite Park Elementary Kitchen Auditorium And Electrical Improvements
Renovation
Results
Minneapolis, MN 55411

Moorhead Public High School
Renovation
Results
$100,000,000 est. value
Moorhead, MN 56560

Baker OLC Shower/Infirmary Building
Construction
$900,000 to $950,000 est. value
Maple Plain, MN 55359

New Community Education Facility
New Construction - 45,000 SF
Construction
$12,500,000 est. value
Worthington, MN 56187

Discovery Middle School and Woodland Elementary School
Renovation
Pending Verification
Alexandria, MN 56308

Reported 07/18/2022 03:51 PM
Project Title

2022 Bond - Le Sueur-Henderson Public Schools

Physical Address View project details and contacts
City, State (County) Le Sueur, MN   (Le Sueur County)
Category(s) Education, Residential
Sub-Category(s) Dormitory, Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $51,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, new construction, renovation and addition to a mixed-use development in Le Sueur, Minnesota. Conceptual plans call for the addition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility. Projects include construction of a new PreK-5th grade school, drop-off area, HVAC improvements, and CTE addition. As of July 15, 2022, this project is in the conceptual phase. The bond is expected to go for ballot on August 9, 2022. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation, Dormitory, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents