Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

SR 29 BU/US 441bu at Fishing Creek in Milledgeville
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Milledgeville, GA 31061

Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Milling and Plant Mix Resurfacing on I-75/SR 401
Infrastructure
Bidding
$20,000,000 CJ est. value
Cartersville, GA 30121

RFP D/B - Three Corporate Hangars
New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Baxley, GA 31513

I-16 Regional Water and Sewer Material Procurement
Infrastructure
Post-Bid
GA

Max Fitness / Macon
New Construction, Infrastructure - 40,703 SF
Post-Bid
$12,000,000 CJ est. value
Macon, GA 31210

Hamilton Crossing Waterline Relocation
Infrastructure
Results
$650,000 est. value
Cartersville, GA

Agriculture Meter Installation
Infrastructure
Results

Residential Window and Door Manufacturing Facilities
New Construction, Infrastructure
Construction
$125,000,000 CJ est. value
Macon, GA 31201

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Ellabell, GA 31308

Forsyth Street Convenience Store and Gas Station
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31201

Rocky Creek Sewer Lines and the Riverside Basin Sewer Project - Macon Water Authorit
Infrastructure
Conception
$28,000,000 CJ est. value
Macon, GA 31201

Bethel Church Road Convenience Store with Fuel Pumps
New Construction, Infrastructure - 6,900 SF
Design
$1,500,000 CJ est. value
Lizella, GA 31052

Last Updated 02/08/2023 12:09 PM
Project Title

Water Main Relocation on S.R. 16 at Flint River Bridge

Physical Address View project details and contacts
City, State (County) Griffin, GA 30224   (Spalding County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner of the project is the Spalding County Water & Sewerage Facilities Authority. The ENGINEER for the project is Paragon Consulting Group, Inc. The approximate extent and character of the Work is generally described as follows: Installation of approximately 4,700 linear feet of 12-inch PVC water main, approximately 105 linear feet of 8-inch PVC water main, and related appurtenances. Also included in the project are a 200 linear foot directional bore of 18-inch HDPE pipe, jack and bore of approximately 128 linear feet of 24-inch steel casing, and jack and bore of approximately 93 linear feet of 14-inch steel casing. Contractor questions regarding the bid should be directed to Jason Graham via email at jgraham@pcgeng.com. All questions must be submitted in writing. The last day for contractor questions is Wednesday, January 18, 2023 at 12:00 PM. Contractor shall mobilize on-site and begin construction within two (2) weeks after issuance of Notice to Proceed. Contractor shall assume by the time the project is awarded and NTP issued that GDOT bridge project P.I. NO. 0013928 will be under construction. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. NOTICE TO BIDDERS: TITLE VI OF THE CIVIL RIGHTS ACT OF 1964, AS APPLIED THROUGH THE CIVIL RIGHTS RESTORATION ACT OF 1987 - The SPALDING COUNTY WATER & SEWERAGE FACILITIES AUTHORITY, in accordance with Title VI of the Civil Rights Act of 1964, 42 U.S.C. 2000d to 2000d-4, as amended by The Civil Rights Restoration Act of 1987, hereby notifies all bidders that no person shall on the grounds of race, color, national origin, sex, age, and handicap/disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity conducted by the recipient regardless of whether those programs, services, and activities are federally-funded or not. The time allowed for Substantial Completion is 90 days, and the time allowed for completion and readiness for final payment is 120 days from the date of commencement. Contractor shall mobilize on-site and begin construction within two (2) weeks after issuance of Notice to Proceed

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents