Similar Projects
Last Updated | 12/21/2022 02:17 PM |
Project Title | 460 Lift Station Upgrade and Force Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Belleville, IL 62220 (Saint Clair County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $811,360 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Upgrades to the existing lift station and replacement of the fore main. A. The work to be performed under this contract consists of providing the labor, equipment, materials, methods, means, safety programs and devices, and testing to construct the Stookey Township 460 Lift Station as shown on the Contract Documents prepared by Thouvenot, Wade & Moerchen, Inc.. B. The work consists of the following, but not limited to: 1. Demolition of Existing Lift Station Fiberglass Enclosure, Piping, and Controls 2. Installation of Wet Well Lid and Valve Vault 3. Installation of 2 submersible pumps 4. Installation of a Control Panel and Service Entrance 5. Installation of 8" PVC force main 6. Installation of Generator 7. Site work and grading |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |