Similar Projects
PH V - USA Softball Hall of Fame Trail
New Construction, Infrastructure
Bidding
$1,600,000 est. value
Oklahoma City, OK

BNSF OKC River Connection
New Construction, Alteration
Bidding
Oklahoma City, OK

Gateway Bridge Bid Package #4
New Construction
Post-Bid
Tulsa, OK 74127

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Resurface (Asphalt) and Bridge Rehabilitation
Results
Anadarko, OK 73005

Grade, Drain, Surface, and Bridge
Results
Norman, OK 73019

Bridge Replacement, 530 Feet South of SE 149th Street and South Douglas Boulevard
New Construction, Infrastructure
Post-Bid
$1,311,469 est. value
Oklahoma City, OK 73195

Bridge and Approaches
Results
Elgin, OK

MP-0487R and MP-0545 PH II Greenway Trail along the Oklahoma River and Wayfinding
New Construction, Infrastructure
Post-Bid
OK 73117

Bridge Water Proof Seal
Results

221st Street Bridge Replacement
Infrastructure
Post-Bid
OK

Bridge Rehabilitation
Results
Haileyville, OK

New Orleans Sidewalk Improvements Aspen to Elm
New Construction, Infrastructure
Post-Bid
Broken Arrow, OK 74011

Bridge Rehabilitation
Results
Hardesty, OK

Bridge and Approaches
Results
Woodward, OK

Last Updated 12/01/2021 03:58 PM
Project Title

District 3 Bridge Project

Physical Address View project details and contacts
City, State (County) OK   (Custer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall: • Drive 14 abutment piles to practical refusal, plan depth 40 feet. • Drive 12 wing piles to at least 10 feet below stream bed or to refusal plan depth 30 feet. • Set 2 caps at height determined by Custer County. • Weld in x braces per plan. • Drive and cut interlock sheeting at least 5 feet below stream bed or to refusal. • Install metal deck form, place and tie 2 layers of reinforcing steel. • Cap all sheeting. • Place guard rail on abutment and wings. • Pour and finish concrete. Project Location: Location N2070 and E960001.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents