Similar Projects
Water Independent Line Replacement Project 2 - City of Burleson
Infrastructure
Conception
$1,453,233 CJ est. value
Burleson, TX 76028

Water Independent Line Replacement Project 2 - City of Burleson
Infrastructure
Conception
$1,453,233 CJ est. value
Burleson, TX 76028

C.R. 1107A Water Line Upgrades
Infrastructure
Design
$511,863 CJ est. value
Cleburne, TX 76031

C.R. 1107A Water Line Upgrades
Infrastructure
Design
$511,863 CJ est. value
Cleburne, TX 76031

8 Diamonds GMP / Fort Worth
New Construction, Infrastructure - 379,950 SF
Bidding
$105,000,000 CJ est. value
Burleson, TX 76028

FM 917 Sewer Line Replacement
Infrastructure
Bidding
$75,000 CJ est. value
Burleson, TX 76028

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

8” Waterline along CR 206
Infrastructure
Post-Bid
$107,730 est. value
Alvarado, TX

Barnes Road Water Line Improvements
Results
$60,000 est. value
Keene, TX 76031

12" Waterline BNSF Railroad Crossings at Fox Run, CR 1205 and CR 310A
Results
$251,538 est. value
Joshua, TX

Salad And Go - Wilshire & John Jones / Burleson
New Construction, Infrastructure - 850 SF
Construction
$300,000 CJ est. value
Burleson, TX 76028

Burleson Medical Office Building
New Construction, Infrastructure - 5,755 SF
Pending Verification
$1,100,000 CJ est. value
Burleson, TX 76028

John Jones Retail Center
New Construction, Infrastructure - 10,300 SF
Pending Verification
$2,700,000 CJ est. value
Burleson, TX 76028

16 Inch Line Southeast of Wilshire Boulevard - City of Burleson
Infrastructure
Conception
$3,138,634 CJ est. value
Burleson, TX 76028

Thomas Square Aparments
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Burleson, TX 76028

Last Updated 08/25/2022 02:04 PM
Project Title

E. Henderson Water Line

Physical Address View project details and contacts
City, State (County) Cleburne, TX 76031   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $157,210 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Cleburne, Texas will receive Sealed Bids for the following project: Bid No. 22-88: E. HENDERSON WATER LINE Project Description: The work to be completed under this contract generally includes, but is not limited to, the following: approximately 1,350 LF of 8" C900 PVC Water line, installation of fire hydrants, water service connections, associated appurtenances and 1,430 SF of asphalt driveway repair, Bid Submittal. All bids shall be submitted in sealed envelopes CLEARLY MARKED with the Project Name, Bid Date and Bid Number on the outside envelope. Bids received after the above-specified time will not be considered. The City of Cleburne will not be responsible if the U.S. Postal Service or any other courier system fails to deliver the sealed bid to the City of Cleburne by the given deadline above. Emailed or facsimile of Proposals will not be accepted. Each bid shall be accompanied by a cashier's check or certified check made payable to the City of Cleburne, or a bid bond, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of five (5%) percent of the total bid. The bid security must be enclosed in the same envelope with the bid. Official plan holders list will only be the list maintained by the City. It is the sole responsibility of all plan holders, whether they have received digital downloads or paper copies of the plans and specifications, to periodically check for Addenda which may have been posted on the Civcast USA website. if issued. Question Submittal: Any questions or communications shall be in writing. Written questions regarding details of the project will be accepted until 12:00 pm (noon) on Monday, June 25th. Written questions must be submitted through the website and answers will be posted through Civcast. The City of Cleburne reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the City of Cleburne for a period not to exceed 30 days from the date of bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents