Similar Projects
Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Laguna Creek Trail - Crossing at State Route 99 - WTL016 - City of Elk Grove
Infrastructure
Conception
$6,320,000 est. value
Elk Grove, CA 95624

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Phase 3 Arden Service Area Pipe and Meter Installation
Infrastructure
Bidding
$30,519,000 est. value
CA

2022 Levee Repairs RD0003 and RD0150, Sacramento River and Steamboat Slough, State Plan
Infrastructure
Bidding
$4,300,000 to $5,200,000 est. value
Sacramento, CA

Modify Ramp Metering Systems
Infrastructure
Post-Bid
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Sierra Highway Sidewalks
Infrastructure
Results
$375,000 est. value
Sacramento, Santa Clarita, CA 91390

Modify Ramp Metering Systems
Infrastructure
Results
$910,000 est. value
Sacramento, CA 95811

Willard Parkway Landscaping Epoch Drive To Kammerer Road - WFL011 - City Of Elk Grove
Alteration
Conception
$875,400 est. value
Elk Grove, CA 95757

MUNI - Design Review - Northpointe Reserve - Dahlin Group
New Construction, Infrastructure
Design
Sacramento, CA 95835

Cold Springs Fire Fence Repair Rebuild
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Sacramento, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Police Facilities Streetscapes Maintenance
Infrastructure
Results
Sacramento, CA

Reported 07/13/2022 03:32 PM
Project Title

Folsom Boulevard Complete Street Improvements - Phase 2 - P000575- County of Sacramento

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95811   (Sacramento County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Exterior Lighting, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024, Construction Completion Expected December 2025
Bids Due View project details and contacts
Estimated Value $5,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and outdoor lighting for a mixed-use development in Sacramento, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project. This project will provide safety enhancements including much needed separated sidewalk connectivity with curb and gutter along southerly Folsom Boulevard frontage between the Starfire and Tiber light rail stations where currently only a dirt shoulder exists. This project also provides pedestrian safety lighting, functional landscaping between the proposed sidewalk and Folsom Boulevard, a buffered bike lane upgrade and, storm drainage improvements. These proposed improvements will provide active transportation safety improvements along this important regional corridor. The County is applying for a grant for the next SACOG Funding Round. Project is included in the Sacramento County's FY 2022-2027 CIP. As of July 12, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated from FY 2024 to 2026. The estimated completion is in 2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents