Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Capital Improvements - Bid Package 4
Alteration
Bidding
$883,452 est. value
Fremont, OH 43420

Mount Vernon High School Boiler Replacement
Alteration
Bidding
$280,000 est. value
Mount Vernon, OH 43050

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Mechanical Maintenance needs for Various Stark County Buildings
Post-Bid
Canton, OH 44702

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Peden Boiler and Domestic Hot Water Tank Replacement 2022
Infrastructure, Alteration
Bidding
$385,000 est. value
Athens, OH

Vacuum Booster Pump Maintenance
Post-Bid
Sandusky, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

One Hot Water Boiler
Alteration
Bidding
Cincinnati, OH

Replacement Boilers
Post-Bid
Dayton, OH 45402

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

Air Cooled Screw Chiller Replacement
Alteration
Bidding
Zanesville, OH

Reported 01/27/2022 08:12 AM
Project Title

Boiler Replacement at Main Street School

Physical Address View project details and contacts
City, State (County) Norwalk, OH   (Huron County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of old boiler along with a new one installed. This is the boiler we are looking for: MPH - 50: 2,100 MBH input / 1,722 MBH output / 50 BPH / 1,725 PPH (Steam) / 3,158 lbs Knocked down boiler includes: rolled tube construction, probe type low water cut-off and pump control, auxiliary probe type low water cut off with manual reset, low fire hold control, steam trim that includes operating control, manual, manual reset high limit, 15 PSI ASME safety relief valve, steam pressure gauge, pump motor contactor and standby aquastat. One combustion full modulation (linkage) Natural gas burner 3 x 208 voltage with 1 x 120 volt control transformer 3/4 HP ODP blower motor, alarm bell with silencing switch, standard indicator light package, full modulation firing (standard linkage), auto-manual firing switch with potentiometer, flame safeguard with UV flame sensor and with 1-1/2" UL gas train. Disconnect and remove Bryan flex tube boiler Pour new housekeeping pad Set and pipe new boiler including: steam line, feed line, drain line, relief outlet, gas line, stack, electrical

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents