Similar Projects
Bridges Over State Route 109 and Over the DT & I Railroad in Fulton County / Wauseon
Demolition, New Construction, Infrastructure
Design
$1,329,657 CJ est. value
Wauseon, OH 43567

Bridges Over State Route 109 and Over the DT & I Railroad in Fulton County / Wauseon
Demolition, New Construction, Infrastructure
Design
$1,329,657 CJ est. value
Wauseon, OH 43567

Villagewide Water Main Replacement
Infrastructure
Bidding
$500,000 CJ est. value
Fayette, OH 43521

Ditch Improvement
Infrastructure
Bidding
$48,009 CJ est. value
Amboy Township, OH 43540

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Commercial Drive New Road Construction
Infrastructure
Post-Bid
$300,000 est. value
Delta, OH

Two Lane Resurfacing - SR 120-00.00 Resurf
Infrastructure
Results
$2,055,960 est. value
Lyons, OH

Wauseon South Brunell Street Roadway Reconstruction
Alteration
Results
$1,147,917 est. value
Wauseon, OH

Resurface Metamora-Amboy Fire Department
Infrastructure
Post-Bid
$430,000 est. value
Metamora, OH 43540

East Lutz Road Improvements
Infrastructure
Results
$1,020,000 est. value
Archbold, OH 43502

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Intersection - SUM-Wooster Road Robinson
Infrastructure
Results
$1,248,937 est. value

Commercial Drive New Road Construction - Nature Fresh
Infrastructure
Post-Bid
$800,000 CJ est. value
Wauseon, OH 43567

2022 Harding Township O.P.W.C. Shaffer Road Resurfacing Project
Infrastructure
Results
$550,000 est. value
Swanton, OH 43558

Sealcoating
Infrastructure
Post-Bid
$200,000 CJ est. value
Wauseon, OH 43567

Last Updated 05/04/2023 12:32 AM
Project Title

Intersection Improvement (Safety)

Physical Address View project details and contacts
City, State (County) Wauseon, OH 43567   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $260,400 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project in Fulton County, to improve safety at two intersections in the Village of Swanton: Hallett Ave and Airport Highway (US-20A) and at S Main St and Airport Highway (US-20A). Project will upgrade existing permitted left turns to protected left turns, As of May 04, 2023, the project is in Conceptual status. Anticipated letting date is March 1, 2025. OHDOT - Intersection Improvement (Safety) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents