Project Title | West Quad Pool Chemical Storage HVAC Upgrade |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 11210 (Kings County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $599,668 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Specification and the accompanying Contract Drawings are intended to include the furnishing and installation, in a workman-like and approved manner, of all labor, materials, equipment and appliances necessary and required to completely install the HVAC Systems as specified and shown on the Drawings. General scope of work shall be as listed below, however, omission of specific items shall not be construed as being omitted from the Contract if the item is mentioned elsewhere or implied. The list is not intended to be complete, but it is to serve as a guide to the character and extent of the work, and in general, shall consist of the following: 1. Cleaning of all duct systems prior to operation. 2. All electrical interlock wiring, except as noted otherwise. 3. Complete DDC control and BAS system. 4. All control and interlock wiring (in conduit) for the BAS loop system and all components. 5. All miscellaneous appurtenances, accessories and specialties required for a complete installation placed into satisfactory operating condition. 6. Signs, charts, labels, etc., conforming to the requirements of the specifications, codes and Authorities Having Jurisdiction. 7. Exhaust ventilation systems including fans, ductwork, motors, dampers, air distribution devices, dampers, and all accessories. 8. Motor starters, motor control centers and variable frequency drives (VFD) for the for mechanical equipment as specified and/or scheduled 9. Power and control wiring to all terminal devices. 10. Provisions for temporary utilities as required to keep existing systems operational. 11. Prime painting of equipment and piping, shop finishes, piping identification, stenciling and color coding. 12. Training, instructions and guarantees. 13. Auxiliary steel required for supporting HVAC equipment, ductwork and piping other than those available in the building structure. 14. Access doors and panels required in acoustical tile hung ceilings and furnishing of all access doors and panels required in plaster or dry wall ceilings and partitions. 15. Duct cleaning. 16. Testing, Adjusting, Balancing and Commissioning. 17. Install duct smoke detectors furnished by Electrical Contractor. 18. Protection during construction. 19. Preliminary Balancing/Testing effort. 20. 120 Volt and 24 Volt power, including all step-down transformers, to all control devices. 21. Testing of existing systems including air systems readings. 22. Caulking around sleeves and fire-stopping at all floor and wall penetration of piping and ductwork. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |