Similar Projects
North Central University Student Union, Business and Science Facility
Demolition, New Construction, Infrastructure - 28,200 SF
Design
$15,000,000 CJ est. value
Minneapolis, MN 55404

Artspace Northrup King Buildings #2, #3, & #8
Renovation - 163,497 SF
Post-Bid
$2,000,000 CJ est. value
Minneapolis, MN 55413

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 WS 03A - Concrete
Renovation
Construction
$700,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Immersion Academy Addition and Renovation - Part 2, Bid Package #3
Addition, Demolition, Renovation, Infrastructure - 20,000 SF
Construction
$280,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Mandarin Immersion Academy Addition and Renovation - Part 2, Bid Package #4
Addition, Demolition, Renovation, Infrastructure
Construction
$31,000,000 CJ est. value
Saint Paul, MN 55116

RFQ D/B - Upgrade Ventilation Dorms 6 and 8 and Replace Fire Alarm Dorm 6 at the Hubert H. Humphrey Job Corps Center
Renovation
Post-Bid
$5,000,000 CJ est. value
Saint Paul, MN 55108

Jie Ming Mandarin Immersion Academy Addition and Renovation - Part 2 Bid Package
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$31,000,000 CJ est. value
Saint Paul, MN 55116

2022 Handke Center Renovations
Renovation
Results
Elk River, MN 55330

Last Updated 02/08/2023 05:39 PM
Project Title

Minnesota State Academy For The Deaf Security Corridor

Physical Address View project details and contacts
City, State (County) Faribault, MN 55021   (Rice County)
Category(s) Education
Sub-Category(s) Vocational School
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $6,862,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 8, 2023, construction is underway, however, a timeline for construction has not been confirmed. No further inquiries to be accepted. This project creates a new a security corridor addition to connect the three primary existing academic buildings on the MSAD campus. The security corridor will serve as the main entry for the campus and improve safety and security for students, staff, and visitors. Areas adjacent to the corridor will be remodeled to include a new administration suite, staff workroom, lunchroom, restrooms, and science lab. Additional work includes replacement of the wood shakes with metal panels and brick on Smith and Quinn Halls, window replacement on Quinn Hall, and the addition of a lift to create an accessible entry on Noyes Hall. This project has a 3 % Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents