Similar Projects
Physical Therapy Clinic
Renovation
Conception
Tuscaloosa, AL 35404

Sickle Cell Clinic
New Construction - 6,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Birmingham, AL 35294

Olaire Building Medical Clinic
New Construction
Design
Saraland, AL 36571

ADPH Various Health Department Improvements
Renovation, Infrastructure
Bidding
$12,000,000 CJ est. value
Birmingham, AL 35233

Spain Wallace 5th Floor Patient Room Renovation
Renovation - 1,400 SF
Bidding
$500,000 CJ est. value
Birmingham, AL 35294

CH20 3rd Floor Renovation for Family Medicine
Renovation
Post-Bid
$350,000 est. value
Birmingham, AL 35205

Montgomery Area Mental Health Authority Inc.
Renovation
Post-Bid
Montgomery, AL 36117

Architectural Services for New Regional Laboratory and Medical Facility
New Construction - 25,000 SF
Results
Less than $9,400,000 est. value
Huntsville, AL

Renovations to 401 Beacon Parkway West for JBS Mental Health Authority
Renovation
Results
$347,847 est. value
Birmingham, AL 35209

DaVita Imperial Home Training
Renovation - 3,312 SF
Construction
$700,000 est. value
Birmingham, AL 35242

DaVita Imperial Home Training
Renovation - 3,312 SF
Construction
$700,000 est. value
Birmingham, AL 35242

The Wellness Group
Renovation
Pending Verification
Clanton, AL 35045

Providence Park Circle
New Construction
Pending Verification
Mobile, AL 36695

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Modular Clinic Infrastructure Package
New Construction
Post-Bid
Mobile, AL

Last Updated 09/29/2022 11:06 AM
Project Title

Community Health Services Building Exterior ADA Access

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35205   (Jefferson County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $122,215 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Prime Contractors that are properly licensed for this type of work are required to prequalify in order to bid. For more information about the project and how to prequalify, please go to the UAB Facilities Bid Calendar. Applicants for Prequalification are strongly encouraged to submit applications at the earliest date possible following the first date of advertisement. UAB will review applications as submitted and notify applicants within two (2) working days of submission. Applications received after the date of the Pre-bid Conference may not be considered.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents