Similar Projects
(Liquid Fuels) 2022 Roadway and Storm Sewer Improvements
Infrastructure
Bidding
$350,000 est. value
Baldwin, PA

Penn Hills Phase XIV 2022 Spot Liner and Specialty Repair Excavation Contracts
Infrastructure
Bidding
$400,000 est. value
Penn Hills, PA

2021 Paving Program
Post-Bid
Pittsburgh, PA

2021 Sanitary Sewer Repair Projects - Grow Grant Lining Contract
Post-Bid
Pittsburgh, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Roadway and Storm Sewer Improvements
Results
Pittsburgh, PA 15123

GRP 111-22-7135-1
Infrastructure
Bidding
$2,500,000 to $4,999,999 est. value
Pittsburgh, PA 15289

CD 46 John Street (Brighton Street) - Road Reconstruction
Post-Bid
Less than $25,000 est. value
Chalfant, PA 15112

Double Bituminous Seal Coat
Results
Jefferson, PA 15344

Mooncrest Community Center Interior Renovations - Mechanical Contract
Alteration
Bidding
$60,000 est. value
Coraopolis, PA 15108

Bituminous Surfacing Materials
Post-Bid
Carnegie, PA

CIPP Rehabilitation of the Lower Saw Mill Run Interceptor
Results
Pittsburgh, PA 15233

2022 Roadway and Storm Sewer Improvements
Demolition, Infrastructure
Bidding
$350,000 est. value
Baldwin, PA

Manhole Inserts
Post-Bid
Carnegie, PA

Mckeesport Park and Ride Improvements
Results
McKeesport, PA 15132

Reported 04/30/2022 12:00 AM
Project Title

2022 Penn Hills WPCD Facilities Upgrades

Physical Address View project details and contacts
City, State (County) Penn Hills, PA 15235   (Allegheny County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Mechanical, Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Project Cost: Contract 1 = $83,000, Contract 2 = $73,000, Contract 3 = $34,000. Contract #1 - Long Road Pump Station Bypass Installation: This project includes the removal of an existing sanitary sewerline and replacement with an 18" PVC line including the supply and installation of new slide gates at the Long Road Sewage Pump Station, including equipment, labor, bypass pumping and all other appurtenances. Contract #2 - Gascola Boiler Replacement: This project includes the removal and installation of a replacement boiler at the Gascola Equalization Facility that is used to heat the control building including installation, piping and fittings, electrical work, asbestos removal, labor, and all other appurtenances. Contract #3 - Long Road Pump Station Paving: This project includes the removal of existing pavement and an existing aggregate pad area and replacement with full depth asphalt pavement at the Long Road Sewage Pump Station, including materials, equipment, labor, and all other appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents