Similar Projects
Last Updated | 12/11/2020 03:44 PM |
Project Title | County Route 8 (Lowman Crossover) Bridge Over Chemung River |
Physical Address | View project details and contacts |
City, State (County) | Elmira, NY 14901 (Chemung County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will replace the entire superstructure along the current alignment. The existing concrete deck and supporting adjacent prestressed concrete box beams and pedestals will be replaced with a reinforced concrete deck on continuous steel girders, and new bearings and pedestals.The approach slabs will be removed and replaced, and the piers will receive isolated concrete repairs as needed. The abutments will be replaced with integral abutments utilizing the existing piles. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |