Similar Projects
Resurfacing
Results
Less than $11,248,896 est. value
FL

Resurfacing
Results
Less than $9,900,277 est. value
FL

Add Turn Lane(s) Drainage Milling and Resurfacing - SR 700 (US 98)
Infrastructure
Bidding
$828,799 est. value
FL

Intersection Improvement Concrete Pavement Milling and Resurfacing Base Work - SR 25 AND SR 70
Infrastructure
Bidding
$7,866,150 est. value
FL

Resurfacing
Results
Less than $2,066,728 est. value
FL 33852

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing
Results
Less than $4,219,718 est. value
FL

Widening Right Turn Lane
Results
Less than $248,019 est. value
FL

Arbuckle Creek Road Turn Lane Highlands County
Infrastructure
Bidding
Sebring, FL 33870

Sebring Parkway Phase IIA, Sebring Parkway Phase IIB and Utility Modifications
Results
Sebring, FL 33870

Sebring High School Resurfacing
Post-Bid
Sebring, FL 33870

Intersection Improvement - Widening - Base Work
Infrastructure
Results
$1,750,277 est. value
FL

Asphalt Milling - Various Roadways
Term Contract
Results
Sebring, FL 33870

Asphalt Repair
Results
$400,000 est. value

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Last Updated 08/13/2021 06:21 AM
Project Title

Cr 623 (Kenilworth Boulevard) Mill and Resurfacing Between Mini Ranch Road and Haywood Taylor Boulevard

Physical Address View project details and contacts
City, State (County) Sebring, FL 33870   (Highlands County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide all labor, materials and equipment to construct the CR 623 (Kenilworth Boulevard) Mill & Resurfacing Between Mini Ranch Road West & Haywood Taylor Blvd project. The work consists of milling and resurfacing CR 623 from Haywood Taylor Blvd to Mini Ranch Road, approximately 1.478 miles, in Sebring, Florida, construction of associated safety and drainage improvements, construction or reconstruction, as appropriate, of the existing side road approaches and driveways, and installation of sod

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents