Similar Projects
Lealman Heights Redevelopment
New Construction
Conception
Saint Petersburg, FL 33714

Highlander Park Aquatic Complex
New Construction, Infrastructure
Conception
Dunedin, FL 34698

Downtown Largo City Hall
New Construction
Design
$25,000,000 est. value
Largo, FL 33779

Lamplight Village Redevelopment
New Construction
Design
Saint Petersburg, FL 33702

Construction Manager at Risk Services (GMP) Southwest Recreation Aquatic Center
Infrastructure
Bidding
$4,500,000 est. value
Largo, FL

Clearwater Center
Renovation
Post-Bid
Clearwater, FL 33764

Replace Pool Marcite Finish at USCG Air Station Clearwater
Post-Bid
$30,000 est. value
Clearwater, FL 33762

Development of Residential Property - Lealman Community Redevelopment Area
Results
Clearwater, FL 33756

Tropicana Field Redevelopment
Results
Saint Petersburg, FL

334 Saint Pete Residences
New Construction - 428,702 SF
Construction
$48,233,750 est. value
Saint Petersburg, FL

Evergreen Village AKA Lincoln Village Supportive Housing
New Construction
Construction
$5,118,668 est. value
Pinellas Park, FL 33781

Anclote Harbor Apartments
New Construction
Pending Verification
Tarpon Springs, FL 34689

Anclote Harbor Apartments
New Construction
Pending Verification
Tarpon Springs, FL 34689

Lake Tarpon Center
New Construction, Demolition - 229,482 SF
Conception
Tarpon Springs, FL

Gateway Project - Artisan East Apartments
New Construction - 17,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Dunedin, FL 33755

Reported 04/19/2022 12:00 AM
Project Title

770 Apartments

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33701   (Pinellas County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Office, Parking Garage, Swimming Pool(s)
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, New Construction, Fitness Center, New Construction, Apartments/Condominiums, 6 Stories Above Grade, 79,981 SF New Construction 146 Unit(s), Parking Garage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents