Similar Projects
Lift Station No. 38
New Construction
Post-Bid
$98,819 est. value
Melbourne, FL 32901

Lift Station No. 1 Replacement Project
New Construction
Post-Bid
Cocoa, FL 32922

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Airport West Sanitary Sewer Collection
Renovation, Infrastructure
Post-Bid
Sebastian, FL

Intermediate Pump Station Improvements
Results
$457,300 est. value
Cape Canaveral, FL 32920

Lift Station N-09 Rehabilitation
Renovation
Post-Bid
Titusville, FL 32796

Lift Station #3 Rehabilitation
Results
$340,000 est. value
Cape Canaveral, FL 32920

Lift Station S-16 Rehabilitation
Renovation
Post-Bid
Indian Harbour Beach, FL 32937

Marina Lift Station Improvements
Results
Less than $522,000 est. value
Titusville, FL 32796

Lift Station 43 Rehabilitation
Results
Palm Bay, FL 32907

Lift Stations J-03, J-04, and J-05 Rehabilitation
Results
Port Saint John, FL 32927

Lift Station S-21 Rehabilitation
Results
$60,216 est. value
Viera, FL 32940

Rehabilitation of Brevard County Lift Station M-17 and V-11
Results
$196,930 est. value
Merritt Island, FL 32952

Lift Station T-09 Rehabilitation
Results
Viera, FL 32940

Last Updated 08/26/2021 07:29 AM
Project Title

Lift Station 26 Rehabilitation

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32905   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $69,025
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the Rehabilitation of LS-026 includes removal of the existing valve pit; installation of a new above-grade discharge pipe manifold, valve assembly and electrical conduit stub outs; lining/coating of the wet well interior; replacement of the pump pedestals, guide rails, discharge piping, and related appurtenances; and all ancillary materials and labor to complete the work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents