Similar Projects
H--Water Tank Testing Services - 554
Post-Bid
Aurora, CO 80045

H--Water Tank Testing Services - 554
Post-Bid
Aurora, CO 80045

SCWTP Backwash Tank Improvements
Results
Less than $200,000 est. value
Louisville, CO 80027

Saint Vrain Hub Chilled Water System
Results
Longmont, CO 80501

Apex Center Domestic Hot Water Storage Tank Replacement
Construction
Arvada, CO 80005

H--Water Tank Testing Services - 554
Post-Bid
Aurora, CO 80045

29Th Street 5.5 Mg D115 Water Storage Tank
Results
Loveland, CO 80537

12000 Gallon Vertical Fiberglass Storage Tank
Post-Bid
CO

J--MEVE (CM) Replace GAC Water Plant
Results
Lakewood, CO

21K Verticle Mag Tanks
Post-Bid
Ridgway, CO 81432

Upper Water Storage Tank Rehabilitation Project
Results
Del Norte, CO

12K Verticle Mag Tanks
Post-Bid
Ridgway, CO 81432

1 Million Gallon Water Storage Tank
Results
Less than $4,630,916 est. value
Steamboat Springs, CO 80477

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Liquid De-Icer Storage Tanks
Results
Arvada, CO 80002

Reported 05/20/2020 12:00 AM
Project Title

DOVE Compliance Improvements

Physical Address View project details and contacts
City, State (County) Victor, CO   (Teller County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Relocating the City’s point of entry (POE) chlorine residual monitoring location from inside the WTP to downstream of the City’s second finished water storage tank and installing a remote chlorine monitoring station. Installing pressure transducers to monitor the level in each finished water storage tank to replace existing level indicating devices and transmitters. Retrofitting the altitude valve on the inlet of the second finished water tank to function at low operating pressure and update valve piloting with a booster pump and pressure tank to facilitate valve operation via solenoid control. This will require construction of a small structure Implementing controls improvements to facilitate operations and reporting of proposed systems.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents