Similar Projects
Reported | 05/20/2020 12:00 AM |
Project Title | DOVE Compliance Improvements |
Physical Address | View project details and contacts |
City, State (County) | Victor, CO (Teller County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Relocating the City’s point of entry (POE) chlorine residual monitoring location from inside the WTP to downstream of the City’s second finished water storage tank and installing a remote chlorine monitoring station. Installing pressure transducers to monitor the level in each finished water storage tank to replace existing level indicating devices and transmitters. Retrofitting the altitude valve on the inlet of the second finished water tank to function at low operating pressure and update valve piloting with a booster pump and pressure tank to facilitate valve operation via solenoid control. This will require construction of a small structure Implementing controls improvements to facilitate operations and reporting of proposed systems. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |