Similar Projects
Last Updated | 06/23/2023 02:04 AM |
Project Title | OUSD Stuart Mesa WMHP Labor |
Physical Address | View project details and contacts |
City, State (County) | Oceanside, CA 92058 (San Diego County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | OUSD Stuart Mesa WMHP Labor and Equipment DEMO OF EXISTING UNITS TO INCLUDE: Disconnect existing controls (Utilize on new equipment if applicable) Demo existing line voltage service disconnect and associated components. Demo existing gas flex at unit including gas valve. Disconnect existing condensate drains. Disconnect existing seismic clips/ springs as required. Crane off existing units and recover refrigerant and dispose per EPA requirements. INSTALLATION (LIKE FOR LIKE) OF NEW WALL MOUNT HEAT PUMPS (6): Install new adapter curbs for associated units (if applicable) Furnish install new condensate piping w/P-Trap, clean-out, connection to existingPOC. Reconnect existing electrical to new units. Demo existing gas lines as all new units are Heat Pumps and no longerrequired. Furnish and install new NEMA 3R Service Electrical disconnect w/ fuses matched to units maximum fuse size. Furnish and install new liquid tight for high and low voltage wiring to existing roofPOC Ductwork connections to existing S/A, R/A POC's (flex connections asrequired) Installation of unit accessories. ADDITIONAL ITEMS INCLUDED IN SCOPE: Project management, Field supervision, Administrative Support, Field Labor & Rental Equipment as required to complete the Scope of Work as described. Training, Start Up and Performance Verification of Newly Installed Equipment. Start up of Units to factory specifications including Start up Documentation along with Operation and maintenance manuals Outside air economizer verification to be set per occupancy (set-point) Air Balance Assistance DDC controls verification of items removed/ reinstalled. Scrape and paint existing items listed (gas pipe, exposed duct on roof) with Rust-Oleum paint (as- required). Material Handling, Trash Removal Trash Dumpsters/Receptacles as required to complete Scope of Work Tool/Material Storage Containers required to complete Scope of Work DIR Compliance Crane/Hoisting Equipment required to complete Scope of Work Crane Plans/ Safety Coordination This is a public works project and the successful bidder shall comply with the provisions of the Labor Code pertaining to payment of the generally prevailing rate of wages and apprenticeships or other training program. The District reserves the right to reject any and all bids and to waive any informalities or irregularities in the bidding. Each bidder shall at all times possess all appropriate and required licenses or other permits to perform the work as identified in the Contract Documents |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |