Similar Projects
Commodore Boulevard Widening - 64119 - City of Melbourne
Infrastructure
Conception
$2,250,000 CJ est. value
Melbourne, FL 32935

Commodore Boulevard Widening - 64119 - City of Melbourne
Infrastructure
Conception
$2,250,000 CJ est. value
Melbourne, FL 32935

Mosswood Townhomes Subdivision
New Construction, Infrastructure
Design
Melbourne, FL 32935

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Viera Booster Station Chloramination Improvements
Renovation, Infrastructure
Bidding
$590,000 CJ est. value
Melbourne, FL 32940

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pineapple Complete Streets Project
Results
$1,119,730 est. value
Melbourne, FL 32935

Front Street Complete Streets Project
Results
Melbourne, FL 32901

Titusville Point - Site Development
New Construction
Construction
Titusville, FL 32780

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

Eau Gallie Office Park, Phase 6 - Makoto's Addition
Addition, Demolition, Renovation, Infrastructure - 3,913 SF
Pending Verification
$1,000,000 CJ est. value
Melbourne, FL 32934

SpaceX Operations Area / Kennedy Space Center
New Construction, Infrastructure - 480,000 SF
Pending Verification
$258,000,000 CJ est. value
Titusville, FL 32780

Kingsmill Subdivision Road Resurfacing and Reconstruction
Infrastructure
Conception
$1,000,000 CJ est. value
Melbourne, FL 32934

Port Canaveral Master Plan: The Aquarium Project
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Port Canaveral, FL 32920

Last Updated 11/15/2022 08:03 AM
Project Title

Dredged Material Management Area BV-4B Construction

Physical Address View project details and contacts
City, State (County) Mims, FL 32796   (Brevard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $4,982,460 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project generally entails clearing approximately 65 acres of land, construction of an approximately 165,000 cubic yard earthen dike, installation of a gravel blanket drain within the dike, construction of a stabilized earth perimeter road, fabrication and installation of three steel box weirs and accompanying aluminum access walkway structure; installation of various piping, manholes and culverts, grassing establishment, and other associated work. The Contractor must include a written description of his/her experience and technical capabilities with such construction. At a minimum, this written description should include a description of at least 3 similar projects in the past 10 years on which the contractor was the general or primary contractor. All bids not containing written information demonstrating the Contractor's experience and technical capabilities will be disqualified. If in the opinion of the District and its Engineer, the Contractor's experience and technical capabilities do not indicate similar experience, the bid will be disqualified. The Contractor may be asked to provide additional information to assist the District and its Engineer in making this determination. The District will award the bid to the qualified and responsive Contractor with the lowest bid price. The BV-4B project area, located in Brevard County, Florida, just west of the Indian River between Mims and Titusville, and lies South of Cuyler Street and West of Hammock Road. The Contractor will have a period of 425 calendar days from the Notice to Proceed to Substantial Completion to construct the entire project. If you have any questions concerning this permit modification, please contact the project manager Jason D. Perryman at the letterhead address, by telephone at 321- 504-3771 or by electronic mail at jason.d.perryman@usace.army.mil.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents