Similar Projects
40th St - 33rd St
Infrastructure
Bidding
WV

Holbert Rd Rockfall
Infrastructure
Bidding
Fairmont, WV 26554

Mountain Valley Elementary School Renovations
Renovation
Post-Bid
Bluefield, Princeton, WV 24701

Improve Airport Drainage, Phase 1
Post-Bid
Huntington, WV

Dallas Pike Road Slip Repair +5
Results
WV

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Installation of a 36" Drain
Infrastructure
Bidding
Danville, WV

Lower Mud River Levee Protection Project
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Milton, WV 25541

Walnut Hill
Results
WV

Beechwood Detention Project
Infrastructure
Bidding
Parkersburg, WV

Williamson (Hight) Drainage and Portals
Infrastructure
Post-Bid
Charleston, WV

Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Results
$500,000 to $1,000,000 est. value
Wheeling, WV 26003

Drain Replacement in the Student Center Ram's Den
Infrastructure
Post-Bid
Shepherdstown, WV

Jewell Hill
Results
WV

Stormwater Pond 1 Diversion Project
Infrastructure
Post-Bid
Martinsburg, WV

Last Updated 09/16/2021 04:17 PM
Project Title

Buffalo Creek and Gauley Flood Repairs

Physical Address View project details and contacts
City, State (County) Clay, WV 25043   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of 13.5 miles of railroad track to provide access to repair sites, replacement of culverts, cleaning out of existing culverts, repair of washouts, restoration of the walking trail and repairs to three bridges.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents