Similar Projects
Water Main Replacement
Infrastructure
Bidding
Camilla, GA

Valve Boxes and Risers (Three (3) Year Multiyear Contract)
Term Contract
Bidding
Stone Mountain, GA 30083

Debbie Lane Water Line Replacement
Post-Bid
Less than $130,000 est. value
Flowery Branch, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Blanchard Water Treatment Plant Lift Station
Results
Evans, GA 30809

Fire Hydrant and Gate Valves
Results
Atlanta, GA 30303

State Route 20 Widening Water Line Relocation - Scott Road to Hill Road
Infrastructure
Bidding
GA

Metal Aluminized-Coated Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA

Water System Improvements Old Alabama Road Utility Relocation - Phase I
Results
GA

FY 2020 CDBG for Water System Improvement
Term Contract, Infrastructure
Bidding
Cairo, GA

Annual Contract for General Pipe Work
Term Contract
Post-Bid
Morrow, GA 30260

No Lead Brass Fittings
Term Contract
Results
Less than $39,757 est. value
GA

Pre-Qualifying Pipeline Contractors
Infrastructure
Bidding
GA

Water System Improvements
Post-Bid
Dahlonega, GA 30533

Fire Hydrants
Results
Less than $27,779 est. value
College Park, GA 30337

Reported 09/14/2021 12:00 AM
Project Title

Agriculture Meter Installation

Physical Address View project details and contacts
City, State (County) State-Wide: GA
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The State Entity is Seeking Suppliers for the Agricultural Meter Installation Project. This project encompasses new meter installations for withdrawal sources in which the permittee submitted an application for an agricultural water withdrawal permit to the State Entity prior to December 31, 2002, in accordance with O.C.G.A. §§ 12-5-31 and 12-5-105. This project will also include repair and replacement of meters that are currently installed in the state and not functioning. The project will be limited to four priority river basins – the Flint River Basin, Suwannee River Basin, Chattahoochee River Basin and Ochlockonee River Basin and will cover 61 counties (Exhibit B). Meter installations, repairs and replacements within this scope of services will need to be completed between October 1 and April 15.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents