Similar Projects
Block 7 Mixed-Use Development
New Construction, Infrastructure - 125,000 SF
Design
$32,000,000 CJ est. value
Eau Claire, WI 54703

Menomonie Market Food Co-op
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Eau Claire, WI 54701

7 Brew Site Package / Eau Claire
Infrastructure
Bidding
$300,000 CJ est. value
Eau Claire, WI 54703

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Sanitary Sewer and Watermain Extensions
Infrastructure
Post-Bid
$690,000 est. value
Augusta, WI

Sam Davey ES Water Mains Alterations
Results
Eau Claire, WI 54703

Cannery District Street Improvements
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Bid Package #4 County Materials Complex
New Construction, Infrastructure
Post-Bid
Eau Claire, WI 54703

City Wide Street and Utility Reconstruction
Infrastructure
Results
Eau Claire, WI

City Wide Water Utility and Curb Replacement
Infrastructure
Results
Altoona, WI

Bradwood Avenue Reconstruction
Infrastructure
Results
Altoona, WI 54720

Kane Road (Folsom Street to STH 312) Reconstruction
Infrastructure
Results
Eau Claire, WI 54703

City Wide Water Utility and Curb Replacement
Infrastructure
Results
Altoona, WI

Last Updated 09/14/2022 02:03 PM
Project Title

Wellhouses #8 and #9

Physical Address View project details and contacts
City, State (County) Altoona, WI 54720   (Eau Claire County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $15,263,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City Of Altoona will receive and accept bids ONLY through QuestCDN via the online electronic bid service (QuestvBid) for the construction of Wellhouses #8 and #9. The work for which bids are asked includes the following: the construction of two (2) 760 square foot masonry-block municipal wellhouse buildings, each including the furnishing and installing of a vertical turbine well pump and 40 hp motor, an outdoor natural gas generator set, chemical feed systems, mechanical and process piping, plumbing, electrical, control system integration, underground water, sanitary sewer and storm sewer construction, and all related site restoration. The anticipated substantial completion date for Wellhouse #8 is October 7, 2023, and the anticipated substantial completion date for Wellhouse #9 is April 25, 2024. Planholders list will be updated interactively on our web under Bidding. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at website. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at website. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City of Altoona. CONSULTING ENGINEER: MSA Professional Services, Inc. 1230 South Boulevard Baraboo, WI 53913 Brad Stuczynski, P.E. 1 (608) 355-8964 WNAXLP (Ldr-Tele., August 24, 2022) NOTICE OF THE BOARD OF REVIEW FOR THE CITY OF ALTOONA NOTICE IS HEREBY GIVEN, that the Initial Board of Review Meeting for the City of Altoona, Eau Claire County was held on the 26th day of May, 2022. The meeting convened at 5:45 pm at the Altoona Council Chambers located at 1303 Lynn Avenue, Altoona, WI and adjourned until September 29, 2022 at 5:00 p.m. at which time the Board will review and examine the assessment roll for real and personal property in the City of Altoona to perform such duties imposed by law. On-line viewing of the Assessment Roll: Please note the change to the Open Book. There will be an online viewing of the assessment roll beginning August 25, 2022 after which time there will be daily schedules available from the moment property owners receive their notice until the 48 hours before the Board of Review. To view the on-line assessment roll, please visit website and click on ALTOONA. In-person viewing of the Assessment Roll: Open Book will take place at Altoona City Hall, 1303 Lynn Avenue, Altoona, WI, on September 8, 2022 from 11:30 a.m. - 1:30 p.m.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents