Similar Projects
US 1 at SCL Railroad (No. 1)
Demolition, New Construction, Infrastructure
Conception
$9,325,000 CJ est. value
Elgin, SC 29045

US 1 at SCL Railroad (No. 1)
Demolition, New Construction, Infrastructure
Conception
$9,325,000 CJ est. value
Elgin, SC 29045

S-349 (Wildwood Ln.) over Sandy Branch Twenty-Five Mile Creek Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Elgin, SC 29045

S-349 (Wildwood Ln.) over Sandy Branch Twenty-Five Mile Creek Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Elgin, SC 29045

Playground Equipment Install for Goodale
Infrastructure
Bidding
$270,000 CJ est. value
Camden, SC 29020

2023 Road Resurfacing Project
Infrastructure
Bidding
$200,000 CJ est. value
Camden, SC 29020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roscoe Avenue and City Hall Pavement Project
Infrastructure
Post-Bid
Camden, SC 29020

Intersection Improvements for Kershaw County School District
Infrastructure
Results
Kershaw, SC

Infrastructure Improvements
Infrastructure
Results
Kershaw, SC

Gates Village Subdivision
New Construction, Infrastructure
Pending Verification
$58,000,000 CJ est. value
Lugoff, SC 29078

KershawHealth Karesh Long Term Care - The Health Services District of Kershaw County
Addition, Demolition, New Construction, Renovation, Infrastructure - 87,690 SF
Pending Verification
$34,568,758 CJ est. value
Camden, SC 29020

Sanitary Sewer Replacement
Infrastructure
Post-Bid
$4,300,000 CJ est. value
Camden, SC 29020

Rehabilitation/Reconstruction
Infrastructure
Results
SC

Porter Ridge Subdivision
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Elgin, SC 29078

Last Updated 03/30/2023 11:11 AM
Project Title

Wateree Wellness Entrance Improvements Project

Physical Address View project details and contacts
City, State (County) Elgin, SC 29045   (Kershaw County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $29,981 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consist of the partial removal of an existing planted median for a length of approximately 25 LF and the installation of full depth asphalt, pavement markings (area is approximately 14 LF wide by 25 LF long), new concrete curb and gutter, and pine straw mulch on the remaining planted median. Located at Whiting Way and Executive Drive in Elgin SC.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents