Similar Projects
Wastewater Collection System and Water Distribution Improvements - Contract 3
Infrastructure
Bidding
Oronoco, MN

Floodwood 5th Avenue Water Improvements
Infrastructure
Bidding
$318,000 est. value
Floodwood, MN

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

Water System Expansion Utility Improvements
Results
Carver, MN 55315

Tri-Care 4th Addition Street and Utility Improvements
Infrastructure
Bidding
Maple Grove, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

T.H. 10/169 Improvements
Infrastructure
Bidding
Anoka, MN

Regional Drinking Water Project Contract D - Water Distribution System
Renovation
Post-Bid
Cloquet, MN 55720

City Street and Utility Improvements and CSAH Street Improvements
Results
$7,500,000 to $8,500,000 est. value
Clearbrook, MN

Dague Avenue Northeast and 30th Street Northeast Reconstruction
Term Contract, Infrastructure
Bidding
Buffalo, MN 55313

2021 Watermain Replacement
Post-Bid
$520,000 est. value
East Grand Forks, MN

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

Reported 08/20/2021 12:00 AM
Project Title

2021 Watermain Relocation Improvements

Physical Address View project details and contacts
City, State (County) Elk River, MN   (Sherburne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Relocation Improvements project in the City of Elk River consists of installation of approximately 2,745 linear feet of 16-inch HDPE (DIPS) watermain by directional drill or open cut in three locations, removal of a booster station, connections to existing watermain, and related appurtenances

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents