Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Western State Hospital - Building 27 - Roofing Replacement
Alteration
Bidding
$847,400 to $936,600 est. value
Lakewood, WA 98498

Kansas Street Southwest Outfall Replacement and Calistoga Street West Improvements Project
Infrastructure
Bidding
$300,000 to $350,000 est. value
Orting, WA 98360

MHR Residential Composition and Membrane Roof West
Alteration
Post-Bid
$10,000 est. value
WA

MHR Residential Composition Roof
Alteration
Post-Bid
Midland, Sumner, Tacoma, WA 98444

MHR Residential Roofing
Alteration
Results
Spanaway, Tacoma, WA

Cathodic Protection Installation
Infrastructure
Results
$175,000 est. value
Tacoma, WA

112th Street Southwest Water Main Replacement
Infrastructure
Post-Bid
$757,255 est. value
Lakewood, WA 98499

Weatherization Residential Insulation 8560
Alteration
Results
WA

39th Avenue Southwest Phase 4 Halcyon Water Main Replacement
Infrastructure
Post-Bid
$388,000 est. value
Lakewood, WA 98499

Weatherization Residential Insulation 8554
Alteration
Results
WA

Roof Renovation And Repair
Alteration
Post-Bid
Tacoma, WA 98445

Weatherization Residential Insulation 8580
Alteration
Results
WA

MHR - Roof Coating
Alteration
Post-Bid
$1,500 est. value
Lakebay, WA 98349

Weatherization Residential Insulation 8549
Alteration
Results
WA

Reported 04/22/2022 12:00 AM
Project Title

Frontier Park Horse Arena Cover

Physical Address View project details and contacts
City, State (County) WA   (Pierce County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Roofing, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected April 2023
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide cover over a portion of the existing Frontier Park Horse Arena following the feasibility study completed in 2019. The project scope will include but is not limited to: 1. Clear span roof structure approximately 24,000 square feet a. Include lighting and public announcement system 2. Development of a stormwater infiltration system for the roof structure 3. Meet all fire codes which may include: a. Extending fire hydrant system b. Designing a fire sprinkler system for roof structure 4. Facilitate a process with a stakeholder group made up of representatives from the regular horse arena user groups

Details

Division 03 - Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents