Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Dabney Hall Upgrade Phase 3 - 8th Floor
Alteration
Bidding
Raleigh, NC 27607

HVAC - AG Building
Alteration
Bidding
Carthage, NC

Installation of 60-ton AAON HVAC Unit
Post-Bid
Beaufort, NC 28516

Cooling Tower Filtration Project
Post-Bid
Raleigh, NC 27616

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Gas Water Heater and HVAC Venting Replacements
Alteration
Bidding
Raleigh, NC 27604

Replace 250 Ton Chiller (#1)
Post-Bid
$250,000 to $500,000 est. value
Cherry Point, NC 28533

EMD Facility HVAC Upgrades
Results
Wilmington, NC

Steam Cleaning of HVAC Air Handling Equipment
Alteration
Bidding
Goldsboro, NC 27534

Cooling Tower New Marley OEM Stainless-Steel Casing Panels Replacement
Post-Bid
Raleigh, NC 27616

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

HVAC Replacement at Wilson County Health Department
Alteration
Bidding
Wilson, NC 27893

Heat Controller Install
Post-Bid
Chapel Hill, NC 27516

Reported 12/02/2021 12:00 AM
Project Title

WPCC - Building F - HVAC Addition

Physical Address View project details and contacts
City, State (County) Morganton, NC   (Burke County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition: 1. Demolish existing heating and ventilating unit, exhaust fans, and unit heaters in Building F shop area. Demolish hot water piping to the extent shown on the construction documents. 2. Demolish existing lay-in ceiling tiles (grid to remain), return and supply grilles, and lighting fixtures as shown on the construction documents. 3. Demolish existing above ceiling air handling unit. Demolish existing return and outdoor air dampers associated with this unit. Demolish reheat coils, control valves and space temperature sensors associated with this unit. Demolish existing gypsum ceilings as needed to remove equipment. 4. Demolish existing actuators on VVT terminal units for Breeden Hall. Demolish existing space temperature sensors associated with these terminal units. New Work: 1. Install new split system heat pump units to provide air conditioning to Building F shop area. 2. Install new air-handling unit, return and outside air dampers, reheat coils, control valves and space temperature sensors associated with this unit. Repair existing gypsum ceilings as needed and match existing finishes. 3. Install new ceiling tiles, light fixtures, and return and supply grilles. 4. Install new actuators on VVT terminals and space temperature sensors for Breeden Hall. 5. Integrate all new HVAC equipment into campus-side Johnson Facility Explorer BAS System.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents