Last Updated 04/24/2021 04:59 AM
Project Title

150 Feet of Paved Ditch Repair

Physical Address View project details and contacts
City, State (County) Hillsboro, Litchfield, IL (Macoupin, Montgomery Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

150 feet of paved ditch repair on IL 16, 0.2 miles east of Lake Litchfield Road in Litchfield and culvert removal and replacement east of Hillsboro. 20800150 Cu Yd Trench Backfill Base Items 30.000 40200300 Sq Yd Aggregate Surface Course, Type a 4" Base Items 15.000 44004000 Foot Paved Ditch Removal Base Items 150.000 50105220 Foot Pipe Culvert Removal Base Items 50.000 542c5515 Foot Pipe Culverts, Class c, Type 1 Equivalent Round-Size 60" Base Items 50.000 67100100 l Sum Mobilization Base Items 1.000 70100450 l Sum Traffic Control And Protection, Standard 701201 Base Items 1.000 70102620 l Sum Traffic Control And Protection, Standard 701501 Base Items 1.000 x6061460 Foot Paved Ditch (Special) Base Items 150.000 x7011800 l Sum Traffic Control And Protection, Standard Blr 21 Base Items 1.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents