Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Citywide Valve Replacement Project
Term Contract
Bidding
South Gate, CA

Phase 3 Arden Service Area Pipe and Meter Installation
Infrastructure
Bidding
$30,519,000 est. value
CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Construction Management for Alvarado 2nd Pipline
Term Contract
Bidding
$300,000 to $350,000 est. value
San Diego, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Purchase of Twenty Clow Fire Hydrants
Infrastructure
Bidding
Milpitas, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Cleveland Avenue and St. Rose District Sewer and Water Improvements
Infrastructure
Bidding
$1,886,060 est. value
Santa Rosa, CA 95405

Last Updated 04/01/2022 09:36 AM
Project Title

2021 CIP Water Pipeline Replacement Project

Physical Address View project details and contacts
City, State (County) Redlands, CA 92373   (San Bernardino County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project is the installation of approximately 19,000 linear feet of 8” DIP and 750 linear feet of water pipeline including water services, valves, fire hydrants, etc. The work shall consist of furnishing and installing all pipe, fittings, and appurtenances; all traffic control; all utility location and verification; all pavement removal and disposal; all pavement repair; all earthwork; compacting; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents