Similar Projects
Rome Township Landslide Repairs Phase II
Post-Bid
Less than $1,004,890 est. value
Guysville, OH 45735

Precast Concrete Headwalls
Post-Bid

City of Nelsonville – Flood and Drainage Improvements
Results
$60,800 to $66,880 est. value
Nelsonville, OH 45764

Culvert Replacement - SR 691-06.42
Results
OH

Jacking and Boring Services
Post-Bid

ATH-CR10-7.25 Landslide Repairs
Results
Less than $149,000 est. value
Athens, OH 45701

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

Box Culverts
Results

Concrete Pipes
Results

Precast Catch Basins, Risers, and Grates
Term Contract
Results

Slide Repair - SR 124-01.60
Results
OH

ATH-TR153-2.33 Landslide Repairs
Results
Less than $210,500 est. value
Athens, OH 45701

ATH-CR28-4.43 Landslide Repairs
Results
Less than $152,000 est. value
Athens, OH 45701

Miscellaneous - Culverts FY2020A
Results

Slide Repair - SR 56-10.08
Results
Athens, OH 45701

Last Updated 12/29/2020 11:50 AM
Project Title

Baileys Trail System - Doanville

Physical Address View project details and contacts
City, State (County) Nelsonville, OH 45701   (Athens County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $195,693
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Baileys Trail System - Doanville project will mitigate four abandoned mine features and build a trail head in York Township that will serve the Baileys Trail System on the adjacent Wayne National Forest. This project will occur at two different sites. Each site will be accessed from West Bailey Road, south east of Nelsonville. The sites are as follows: Doanville Trailhead (1 Vertical Opening, 1 Subsidence) This site consists of mitigating two dangerous mine openings, building a gravel parking lot, wooden shelter house, and installing a primitive restroom. The dangerous mine openings will be sealed. Doanville Stream Captures ( 2 Mine Portals) This site consists of mitigating two open mine portals that are capturing the adjacent stream flow. The two mine portals will be sealed and the stream will be reconstructed below the portals.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents