Similar Projects
Heritage Hunt Sewage Pumping Station (SPS) and Force Main (FM) Project
New Construction
Design
Woodbridge, VA

Savile Lane Pump Station Rehabilitation
Renovation - 1,445 SF
Bidding
$2,000,000 to $4,000,000 est. value
McLean, VA 22101

Cattail Branch Sewer Pump Station (SPS) Upgrade - Phase III
Renovation
Bidding
Leesburg, VA

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Rady Park Pump Station Replacement
Results
Warrenton, VA

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Sewer and Grease Trap Pumping Services
Infrastructure
Bidding
Suffolk, VA 23434

Design Build Services of Ivy Creek Interceptor Division 5 and 6 and Route 460 Pump Station
Post-Bid
Roanoke, VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

Luray Landing Sewer Pump Station 1
Renovation - 13,050 SF
Bidding
Luray, VA 22835

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Last Updated 03/08/2022 03:13 PM
Project Title

Pump Station 153 Force Main Relocation

Physical Address View project details and contacts
City, State (County) Newport News, VA   (Isle of Wight County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of approximately 1,000 linear feet of 3-inch HDPE force main, 22 linear feet of 4-inch CI force main, connection of the new 4-inch force main to an existing 4-inch DI force main, replacement of an existing sanitary sewer manhole, rehabilitation of 2 existing sanitary sewer manholes and repair of all existing surface features disturbed by the construction activities. The 3-inch HDPE force main is designed to be constructed by Horizontal Directional Drill (HDD) method of construction.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents